← Cable Watch

25 October 2026 · Issue 93

UK Government Proposes New Legislation to Secure Undersea Infrastructure

A new White Paper outlines plans to modernize legal protections for subsea telecoms cables and pipelines. The government is seeking private sector and maritime consultation on the proposals.

Markdown · Transcript · MP3 · Subscribe

Situation

No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. 1 of these operator incidents or notices is new since the last brief (24 Oct 16:06 UTC). Lines marked Elsewhere are Cloudflare Radar's own outage annotations, from anywhere in the world, with the cause as Radar labels it; this archive attributes nothing to anyone. Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.

Executive summary

Today

The UK government has published a White Paper titled ‘Critical Undersea Infrastructure Security and Resilience: Proposals for modernising the UK’s legislation’ to address risks from accidents and sabotage [1]. The proposals aim to reform legislation protecting infrastructure that carries 99% of the UK’s international data traffic and approximately three-quarters of its gas supply [1]. The government is currently seeking consultation from private sector owners, maritime and fishing organisations, and technology providers [1].

Suspected Interference and Anchor Drag

A report by journalist Oleksiy Dushka on 24tv.ua assesses that Russia is conducting a large-scale intelligence campaign using civilian fishing vessels to map undersea cables near the United Kingdom [3]. Dushka's assessment suggests these activities are intended to facilitate potential sabotage that could paralyze international financial systems and blind NATO's intelligence exchange [3]. While the report links these actions to a broader shift toward hybrid warfare, it does not name specific cable systems or provide evidence of a confirmed breach.

Iranian Threats to Strait of Hormuz Subsea Cables

Iranian Revolutionary Guard Corps officials have threatened to target seven undersea internet cables in the Strait of Hormuz to disrupt global commerce and deter U.S. military action [5]. A post on devotedmovement.substack.com reports that Iranian armed forces chief of staff Ali Abdollahi stated the Strait of Hormuz will only reopen if Washington accepts Tehran's demands, specifically detailing plans to cut cables along the Gulf floor [6]. While Iran claims its economy is less reliant on the internet and has established an alternative line with Oman, analysts warn that such actions could lead to a Pyrrhic victory by inviting international retaliation and naval intervention [5].

Separate reporting on mablong.substack.com highlights the broader vulnerability of the 'Undersea Kingdom,' citing specific incidents of subversion such as the Yi Peng 3 severing two data cables in November 2024 and the Eagle S damaging the Estlink 2 power cable and four data cables in December 2024 [4]. The post argues that the ability to sever a country's undersea communications can effectively blind it, framing seabed infrastructure security as a critical issue for national resilience [4].

Regional Infrastructure Development and Sovereign Routing

Bulk Infrastructure has proposed Project Leif Erikson, a $620 million undersea cable project spanning 2,800 miles to connect Norway to Happy Valley-Goose Bay, Canada [9]. The project is currently in the planning and funding stage, requiring official approval from Canada and the European Union, and aims to create a 'sovereign cable system' that bypasses the United States to reduce Canada's reliance on U.S.-connected fiber-optic routes [9]. Meanwhile, leaders of 10 regional organizations, including the Hampton Roads Alliance, issued a statement asserting that the region is implementing the 'Hampton Roads Playbook' to attract private investment in defense, energy, aerospace, and logistics [8]. This strategy has already resulted in $1.37 billion in investments from LS GreenLink and LS Cable & System for a submarine cable plant and copper product manufacturing in Chesapeake [8].

References

  1. Proposals for new legislation to strengthen the security and resilience of critical undersea infrastructure (CUI) - GOV.UK (gov.uk)
    Published: 22 Oct 2026 · gov.uk · Claim type: official_statement · Subject: policy, seabed_security · Jurisdictions: GB
  2. Undersea Cable Surveys in the Eastern Mediterranean set to Resume (en.politis.com.cy)
    Not cited in the text · Published: 24 Oct 2026 · en.politis.com.cy · Claim type: confirmed_fact · Subject: vessel_activity, analysis · Systems named: GSI cable · Vessels named: Abeille Marengo, KOBI RUEGG · Jurisdictions: GR, CY, SA, FR
  3. Russia Is Looking for NATO's Weak Spot, While Trump Is Preparing a Major Deal: What Does This Mean for Ukraine? (24tv.ua)
    Published: 24 Oct 2026 · 24tv.ua · Claim type: analyst_assessment · Subject: analysis, seabed_security · Jurisdictions: GB, INT
  4. From my Bookshelf: Elisabeth Braw’s ‘The Undersea War’ (mablong.substack.com)
    Published: 25 Oct 2026 · mablong.substack.com · Publisher: self-published, not an official or analyst source · Claim type: analyst_assessment (the document's own framing, not the publisher's standing) · Subject: analysis, precedent, seabed_security · Systems named: Balticconnector, Estlink 2 · Vessels named: NewNew Polar Bear, Yi Peng 3, Eagle S · Jurisdictions: AU, INT, FI, SE
  5. What Might Happen If Iran Makes Good on Threats to Sever Undersea Cables - Middle East Forum (meforum.org)
    Published: 24 Oct 2026 · meforum.org · Claim type: analyst_assessment · Subject: analysis, seabed_security, precedent · Jurisdictions: IR, QA, US, INT
  6. Previously on Gilead: Department of Love Briefing (devotedmovement.substack.com)
    Published: 25 Oct 2026 · devotedmovement.substack.com · Publisher: self-published, not an official or analyst source · Claim type: analyst_assessment (the document's own framing, not the publisher's standing) · Subject: seabed_security · Jurisdictions: IR, INT
  7. What would happen if Iran attacks submarine cables beneath the Strait of Hormuz? | The Business Standard (tbsnews.net)
    Not cited in the text · Published: 24 Oct 2026 · tbsnews.net · Claim type: analyst_assessment · Subject: analysis, seabed_security · Jurisdictions: IR, INT
  8. Column: ODU named our opportunities. The region has a plan to capture them., The Virginian-Pilot (pilotonline.com)
    Published: 24 Oct 2026 · pilotonline.com · Claim type: official_statement · Subject: policy, analysis · Jurisdictions: INT, US
  9. 2,800 Mile Undersea Data Cable Plan Leaves The US Out In The Cold - SlashGear (slashgear.com)
    Published: 24 Oct 2026 · slashgear.com · Claim type: analyst_assessment · Subject: policy, analysis · Systems named: Project Leif Erikson · Jurisdictions: CA, NO, INT

Standing status

Operator incident timelines (quoted from each operator's own status page, not summarised by any model):

1 other open incident(s) on those pages name no tracked cable system and are not shown.

Also polled for changes, but carrying no incident listing, so nothing is said about their state: ACMA protection zone — Perth, ACMA protection zone — Sydney, AJC — cable system maintenance, AJC — news, SUBCO, SUBCO — INDIGO West, SUBCO — OAC, Southern Cross Cable Network, Telstra — service status, Vocus — network status.

Incident threads:

Measured corridors (RIPE Atlas traceroute between fixed anchors over 24h, no model involved):

A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. A corridor's baseline is its best sustained path over the days of history shown, a different figure from a route's physical floor below. As data: https://cablewatch.liminallayers.com/data/corridors.json.

Every cable route leaving the mainland (measured hourly, no model involved):

A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in https://cablewatch.liminallayers.com/data/coverage.json.

Collection: 605 successful fetches in 24h, 24 errors across 7 source(s). Generated 2026-10-26 21:02 UTC.