Situation
- INDIGO West: open since 8 Aug, 46 days, per AusInternet. Operator status: Partial Service Disruption.
Latest update, 21 Sep 05:49 UTC (2 days ago): “Scheduled to repair the fault on Indigo West off the coast of Perth has completed. Unfortunately the existing shunt fault on Indigo West in Singapore has deteriorated into a full cable break and services remain down. Repairs off Singapore is expected to be on 16 Oct 2026 until 26 Oct 2026.” - Australia Singapore Cable: open since 4 Sep, 19 days, per Global Secure Layer. Operator status: Identified.
Latest update, 4 Sep 06:49 UTC (19 days ago): “We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.” - INDIGO West: notice posted by Superloop, already on its page when monitoring began 14 Sep; the notice carries no date of its own.
Notice: “We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.” - INDIGO West: works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC, per AusInternet: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
- Measured route: Sydney to Noumea [DIRECT_LOST] at 23 Sep 03:00 UTC — direct paths down to 1 of the 6 this route normally holds. Best path 22.3ms -> 23.1ms. 2 independent vantages. The only system leaving Australia for this destination is Gondwana-1 (TeleGeography).
- Measured route: Sydney to Noumea [RECOVERY] at 23 Sep 06:00 UTC — DIRECT_LOST has cleared: two consecutive hours back to normal. 0 independent vantages. The only system leaving Australia for this destination is Gondwana-1 (TeleGeography).
- Measured route: Perth to Singapore [GROUP_STEP] at 23 Sep 10:00 UTC — 47 of 67 paths stepped, median +124.9ms against each path's own floor. 4 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [RECOVERY] at 23 Sep 10:00 UTC — GROUP_STEP has cleared: two consecutive hours back to normal. 0 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [GROUP_STEP] at 23 Sep 11:00 UTC — 47 of 67 paths stepped, median +134.2ms against each path's own floor. 4 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [RECOVERY] at 23 Sep 11:00 UTC — GROUP_STEP has cleared: two consecutive hours back to normal. 0 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Oman [DIRECT_LOST] at 23 Sep 13:00 UTC — direct paths down to 1 of the 2 this route normally holds. Best path 111.2ms -> 132.0ms. 2 of 4 paths stepped with it. 2 independent vantages. The only system leaving Australia for this destination is Oman Australia Cable (OAC) (TeleGeography).
- Measured route: Perth to Singapore [GROUP_STEP] at 23 Sep 13:00 UTC — 49 of 67 paths stepped, median +145.2ms against each path's own floor. 4 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [RECOVERY] at 23 Sep 13:00 UTC — GROUP_STEP has cleared: two consecutive hours back to normal. 0 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [GROUP_STEP] at 23 Sep 14:00 UTC — 49 of 67 paths stepped, median +121.7ms against each path's own floor. 4 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [RECOVERY] at 23 Sep 14:00 UTC — GROUP_STEP has cleared: two consecutive hours back to normal. 0 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Oman [RECOVERY] at 23 Sep 15:00 UTC — DIRECT_LOST has cleared: two consecutive hours back to normal. 0 independent vantages. The only system leaving Australia for this destination is Oman Australia Cable (OAC) (TeleGeography).
- Measured route: Perth to Singapore [GROUP_STEP] at 23 Sep 15:00 UTC — 48 of 67 paths stepped, median +123.8ms against each path's own floor. 4 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [RECOVERY] at 23 Sep 15:00 UTC — GROUP_STEP has cleared: two consecutive hours back to normal. 0 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured latency (RIPE Atlas, best measured path over 24 hours against each route's best sustained floor over 33 days): Perth to Singapore 192.1ms, up 145.5ms on its 46.6ms floor; Sydney to Singapore 144.5ms, up 48.1ms on its 96.5ms floor.
- Elsewhere: Cloudflare Radar lists no outage with a cable cut as its cause, open or ended in the last 3 days, anywhere in the world.
No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. No operator has posted an update or a new notice on these since the last brief (22 Sep 19:45 UTC). Lines marked Elsewhere are Cloudflare Radar's own outage annotations, from anywhere in the world, with the cause as Radar labels it; this archive attributes nothing to anyone. Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.
Executive summary
- Sucuri reports that simultaneous outages on the C2C and EAC-C2C systems are causing degraded performance for its Website Firewall service [1].
- SUBCO announced plans for three new systems, including Australia-Japan, Guam-Los Angeles, and Perth-Singapore/Indonesia, scheduled to open in 2029 [8].
- TeleGeography reports that in-service submarine cable systems have reached their highest level in two decades, exceeding 709 systems [4].
- Private operators claim the Posts and Telecommunications Division is delaying a submarine cable project in Bangladesh to protect a state monopoly [12].
Today
Sucuri reported that simultaneous outages on the C2C and EAC-C2C systems are causing degraded performance for its Website Firewall service in Asia East and Australia [1]. The company stated that traffic is being rerouted through an upstream provider's backbone, resulting in slower responses and intermittent packet loss [1]. While the issue was identified on September 22, Sucuri has not provided a specific cause, a firm restoration time, or the exact segment of the C2C system affected [1].
Subsea Maintenance Infrastructure Expansion
Global Marine and Orange Marine have partnered to equip a new hybrid-powered cable maintenance vessel with a next-generation Alpha Remotely Operated Vehicle (ROV) [2]. The vessel is currently under construction at Colombo Dockyard in Sri Lanka, with a scheduled delivery date in Q4 2029 [2]. The Alpha ROV, manufactured in France, is designed to operate at depths of up to 3,000 meters to perform cable burial, inspection, and repair operations [2].
Global Infrastructure Expansion and Joint Ventures
DeepOcean and the controlling entity of TFKable Group plan to establish a joint venture to provide integrated inter-array cable services for offshore wind projects [3]. The multi-year development program, which includes the construction of a new purpose-built cable laying vessel (CLV) owned by an entity including Poland's state-owned industrial development agency ARP, aims to integrate manufacturing and installation expertise to reduce supply chain risks [3].
TeleGeography reports that the number of in-service submarine cable systems has reached its highest level in two decades, with over 709 systems now depicted on its interactive map [4]. Research analyst Lane Burdette notes this expansion is driven by massive infrastructure investments to meet international bandwidth demands [4].
Subsea Infrastructure Expansion and Policy
SUBCO announced plans for what it describes as the 'single largest subsea infrastructure build ever,' involving the deployment of 40,000 kilometers of cable to create three new 24-fiber-pair systems: Australia-Japan, Guam-Los Angeles, and Perth-Singapore/Indonesia [8]. These systems are scheduled to open in 2029 to meet global AI bandwidth demands [8]. In Southeast Asia, APTelecom was appointed by Thailand’s National Telecom Public Company Limited (NT) to conduct a USTDA-funded feasibility study for the Thailand, U.S. (THUS) submarine cable system [9]. The proposed 11,500-mile route would link Thailand to the United States via Singapore, Malaysia, Indonesia, Vietnam, and the Philippines while avoiding the South China Sea [9].
Domestic and regional infrastructure projects face varying regulatory and environmental hurdles. Eastern Communications announced investments in the Philippine Domestic Submarine Cable Network (PDSCN), a 2,500-kilometer domestic system spanning Luzon to Mindanao, to support AI adoption and disaster resiliency [11]. Conversely, a private submarine cable project involving Metacore Subcom, Summit Communications, and CdNet Communications has been stalled for nearly three years due to pending clearances in Bangladesh [12]. Private operators in that region claim the Posts and Telecommunications Division is delaying the rollout to protect the state monopoly of Bangladesh Submarine Cable Company PLC (BSCPLC) [12].
Also noted
- Telecom Review Asia reports that autonomous underwater vehicles may be used to check cables, pipelines, or offshore structures [13].
- Subco announced plans for three new hypercable projects across the Indo-Pacific, including APX North [14].
References
- C2C cable outage strains Sucuri connectivity across Asia, Arabian Post (thearabianpost.com)
Published: 22 Sep 2026 · thearabianpost.com · Claim type: official_statement · Subject: fault · Systems named: C2C, EAC-C2C · Jurisdictions: SG, ID, TW, JP, HK, PH (+2 more) - Global Marine partners with Orange Marine to deploy next-generation Alpha ROV on new cable maintenance vessel (Global Marine Group)
globalmarine.co.uk · Also reported by: oceannews.com - DeepOcean, TFKable Outline Plans for Cable Joint Venture with New CLV (marinelink.com)
marinelink.com - How Many Submarine Cables Are There, Anyway? (TeleGeography blog)
Published: 23 Sep 2026 · resources.telegeography.com · Claim type: analyst_assessment · Subject: analysis · Systems named: Apollo · Jurisdictions: INT - What comes after submarine cable defense: Protecting the sea is protecting the country. And protecting the people who are there. (note.com)
Published: 23 Sep 2026 · note.com · Claim type: analyst_assessment · Subject: policy, analysis · Jurisdictions: INT - Undersea cables: the battle for the ocean floor (ft.com)
ft.com - Subco plans 3 new subsea cables to meet growing AI demand | Lawyerly (lawyerly.com.au)
lawyerly.com.au - AI-RAN leaves the lab; 5G apps don't, yet (rcrtech.com)
Published: 22 Sep 2026 · rcrtech.com · Claim type: official_statement · Subject: policy · Systems named: Australia-Japan, Guam-Los Angeles, Perth-Singapore/Indonesia · Jurisdictions: AU, JP, GU, US, SG, ID · Also reported by: rcrwireless.com - APTelecom Signs THUS Study Agreement in Singapore (Submarine Telecoms Forum)
subtelforum.com - Video: AUKUS Partners Test-Fire Torpedo From Drone Submarine off Scotland (The Maritime Executive)
Published: 22 Sep 2026 · maritime-executive.com · Claim type: confirmed_fact · Subject: analysis, policy · Vessels named: XV Excalibur · Jurisdictions: GB, AU, US - Eastern Communications on Building a Resilient, AI-Ready Network for the Philippines (Telecom Review Asia)
telecomreviewasia.com - Private submarine cable: Tk1,500cr investment stuck under sea for 3 years (tob.news)
tob.news - Asia’s Seabed Could Become a Home for Autonomous Robots (Telecom Review Asia)
telecomreviewasia.com - Subco Unveils Indo-Pacific Hypercables for AI Demand | VoIP Review (voip.review)
Published: 23 Sep 2026 · voip.review · Claim type: official_statement · Subject: policy · Systems named: APX North, APX-2, APX West, Echo, Candle · Jurisdictions: AU, JP, SG, ID, TW, PH (+2 more)
Standing status
Operator incident timelines (quoted from each operator's own status page, not summarised by any model):
- INDIGO West · AusInternet — network status · Partial Service Disruption, open since 8 Aug
21 Sep 05:49 UTCIdentified: Scheduled to repair the fault on Indigo West off the coast of Perth has completed. Unfortunately the existing shunt fault on Indigo West in Singapore has deteriorated into a full cable break and services remain down. Repairs off Singapore is expected to be on 16 Oct 2026 until 26 Oct 2026.
page last checked 2026-09-23 19:08 UTC · https://ausinternet.com.au/status/- Australia Singapore Cable · Global Secure Layer — network status · Identified, open since 4 Sep
4 Sep 06:49 UTCIdentified: We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.
page last checked 2026-09-23 19:08 UTC · https://status.gslnetworks.com.au/incidents/wqmz5wt7l8qj- INDIGO West · Superloop — outages · active notice, on the page when monitoring began 14 Sep 21:44 UTC (the page gives no date)
- We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.
page last checked 2026-09-23 19:08 UTC · https://www.superloop.com/outages/ - INDIGO West · AusInternet — network status · works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
page last checked 2026-09-23 19:08 UTC · https://ausinternet.com.au/status/
Also polled for changes, but carrying no incident listing, so nothing is said about their state: ACMA protection zone — Perth, ACMA protection zone — Sydney, AJC — cable system maintenance, AJC — news, SUBCO, SUBCO — INDIGO West, SUBCO — OAC, Southern Cross Cable Network, Telstra — service status, Vocus — network status.
Incident threads:
perth_indigo_2026_08(INDIGO West, INDIGO Central) — 16 documents, last 2026-09-22 (quiet 2d)
Measured path state (RIPE Atlas traceroute over 24h, no model involved):
- perth to singapore — best path 192.1ms, +145.5ms on its best sustained 46.6ms; typical path 276.9ms (+79.3ms per probe against its own history, 21 probes); ocean crossing 149.9ms; queuing 0.7ms; 33 days of history; clean crossing (21 probe(s), 38 reading(s) excluded as below the corridor's physical floor)
- sydney to japan — best path 100.4ms; typical path 168.1ms (-0.1ms per probe against its own history, 16 probes); ocean crossing 127.1ms; queuing 0.5ms; 33 days of history; clean crossing (16 probe(s))
- sydney to nz — best path 26.7ms; typical path 34.5ms (-0.1ms per probe against its own history, 8 probes); ocean crossing 28.0ms; queuing 0.2ms; steady against 33 days of history; clean crossing (8 probe(s))
- sydney to singapore — best path 144.5ms, +48.1ms on its best sustained 96.5ms; typical path 230.2ms (+47.5ms per probe against its own history, 22 probes); ocean crossing 151.9ms; queuing 0.7ms; 33 days of history; clean crossing (22 probe(s))
A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. Per-probe detail is in cablewatch segments.
Every cable route leaving the mainland (measured hourly, no model involved):
- Australia to Guam — best 70.6ms against a 52.0ms floor; 12/24 paths direct (normally 12)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S), PIPE Pacific Cable-1 (PPC-1) - Dili to Australia — best 50.4ms against a 7.1ms floor; 3 paths measured
Timor-Leste South Submarine Cable (TLSSC), North-West Cable System - Melbourne to Tasmania — best 10.0ms against a 5.9ms floor; 8/17 paths direct (normally 8)
Basslink, Bass Strait-1, Bass Strait-2 - Perth to Jakarta — best 62.2ms against a 29.5ms floor; 40 paths measured
INDIGO-West, Australia-Singapore Cable (ASC) - Perth to Oman — best 112.0ms against a 85.0ms floor; 2/4 paths direct (normally 2)
Oman Australia Cable (OAC) · only system on this route - Perth to Singapore — best 50.5ms against a 38.3ms floor; 8/67 paths direct (normally 22)
INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) - Sydney to Fiji — best 37.5ms against a 31.5ms floor; 6/6 paths direct (normally 6)
Southern Cross Cable Network (SCCN), Southern Cross NEXT - Sydney to Hawaii — best 189.2ms against a 80.0ms floor; 2 paths measured
Telstra Endeavour, Southern Cross Cable Network (SCCN), Hawaiki - Sydney to Honiara — best 38.3ms against a 28.0ms floor; 2/2 paths direct (normally 2)
Coral Sea Cable System (CS²) · only system on this route - Sydney to Japan — best 99.0ms against a 76.7ms floor; 18/88 paths direct (normally 25)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S) - Sydney to New Zealand — best 23.4ms against a 21.1ms floor; 50/65 paths direct (normally 50)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Tasman Global Access (TGA) Cable - Sydney to Noumea — best 22.3ms against a 19.3ms floor; 6/9 paths direct (normally 6)
Gondwana-1 · only system on this route - Sydney to Port Moresby — best 37.7ms against a 26.9ms floor; 3/6 paths direct (normally 3)
Coral Sea Cable System (CS²), PIPE Pacific Cable-1 (PPC-1) - Sydney to US West Coast — best 133.7ms against a 118.3ms floor; 282/302 paths direct (normally 283)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Telstra Endeavour
A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in latency_watch.yaml under uncovered.
Collection: 629 successful fetches in 24h, 43 errors across 9 source(s). Generated 2026-09-23 19:39 UTC.