Simultaneous Subsea Cable Outages Degrade Sucuri Connectivity Across Asia and Australia 2026-09-23 This is Cable Watch for 23 September 2026. Simultaneous Subsea Cable Outages Degrade Sucuri Connectivity Across Asia and Australia. Executive summary. Sucuri reports that simultaneous outages on the C2C and EAC-C2C systems are causing degraded performance for its Website Firewall service. SUBCO announced plans for three new systems, including Australia-Japan, Guam-Los Angeles, and Perth-Singapore/Indonesia, scheduled to open in 2029. TeleGeography reports that in-service submarine cable systems have reached their highest level in two decades, exceeding 709 systems. Private operators claim the Posts and Telecommunications Division is delaying a submarine cable project in Bangladesh to protect a state monopoly. Today. Sucuri reported that simultaneous outages on the C2C and EAC-C2C systems are causing degraded performance for its Website Firewall service in Asia East and Australia. The company stated that traffic is being rerouted through an upstream provider's backbone, resulting in slower responses and intermittent packet loss. While the issue was identified on September 22, Sucuri has not provided a specific cause, a firm restoration time, or the exact segment of the C2C system affected. Subsea Maintenance Infrastructure Expansion. Global Marine and Orange Marine have partnered to equip a new hybrid-powered cable maintenance vessel with a next-generation Alpha Remotely Operated Vehicle (ROV). The vessel is currently under construction at Colombo Dockyard in Sri Lanka, with a scheduled delivery date in Q4 2029. The Alpha ROV, manufactured in France, is designed to operate at depths of up to 3,000 meters to perform cable burial, inspection, and repair operations. Global Infrastructure Expansion and Joint Ventures. DeepOcean and the controlling entity of TFKable Group plan to establish a joint venture to provide integrated inter-array cable services for offshore wind projects. The multi-year development program, which includes the construction of a new purpose-built cable laying vessel (CLV) owned by an entity including Poland's state-owned industrial development agency ARP, aims to integrate manufacturing and installation expertise to reduce supply chain risks. TeleGeography reports that the number of in-service submarine cable systems has reached its highest level in two decades, with over 709 systems now depicted on its interactive map. Research analyst Lane Burdette notes this expansion is driven by massive infrastructure investments to meet international bandwidth demands. Subsea Infrastructure Expansion and Policy. SUBCO announced plans for what it describes as the 'single largest subsea infrastructure build ever,' involving the deployment of 40,000 kilometers of cable to create three new 24-fiber-pair systems: Australia-Japan, Guam-Los Angeles, and Perth-Singapore/Indonesia. These systems are scheduled to open in 2029 to meet global AI bandwidth demands. In Southeast Asia, APTelecom was appointed by Thailand’s National Telecom Public Company Limited (NT) to conduct a USTDA-funded feasibility study for the Thailand, U.S. (THUS) submarine cable system. The proposed 11,500-mile route would link Thailand to the United States via Singapore, Malaysia, Indonesia, Vietnam, and the Philippines while avoiding the South China Sea. Domestic and regional infrastructure projects face varying regulatory and environmental hurdles. Eastern Communications announced investments in the Philippine Domestic Submarine Cable Network (PDSCN), a 2,500-kilometer domestic system spanning Luzon to Mindanao, to support AI adoption and disaster resiliency. Conversely, a private submarine cable project involving Metacore Subcom, Summit Communications, and CdNet Communications has been stalled for nearly three years due to pending clearances in Bangladesh. Private operators in that region claim the Posts and Telecommunications Division is delaying the rollout to protect the state monopoly of Bangladesh Submarine Cable Company PLC (BSCPLC). Also noted. Telecom Review Asia reports that autonomous underwater vehicles may be used to check cables, pipelines, or offshore structures. Subco announced plans for three new hypercable projects across the Indo-Pacific, including APX North. That has been Cable Watch for 23 September 2026. Sourcing, claim types and the standing status of every tracked system are in the written brief.