Lightstorm has secured a ₹2,500 crore debt facility from IndusInd Bank to develop an 'AI Superhighway' connecting India's AI infrastructure to Singapore and Malaysia [1]. The project integrates a terrestrial network across southern India with the 3,600-km I-2SEA submarine cable system, which lands in Machilipatnam and South Chennai [1]. This development marks a shift toward treating subsea capacity as a single integrated architecture designed for the low-latency requirements of distributed GPU environments [1].
Transatlantic Expansion via Ireland
McMahon Design and Management Ltd (MDM) announced plans to construct the NARW 1 and NARW 2 transatlantic fiber-optic cable systems, representing a US$500 million investment [2]. NARW 1 is intended to connect Galway, Ireland to Long Island, NY, USA with a target Ready for Service (RFS) date of Q3 2029, while NARW 2 will connect Southern Ireland to New Jersey, USA by 2030 [2]. These projects, alongside MDM's management of the PISCES, IRIS, Rockabill, and Scylla systems, aim to establish Ireland as a primary gateway for high-capacity, low-latency connectivity between the United States and mainland Europe [2].
Content Provider Infrastructure Expansion
TeleGeography reports that content providers have become the dominant users of international capacity, with their bandwidth growth outpacing all other user categories [3]. The number of submarine cables owned by these providers is projected to grow from 20 in 2017 to over 60 by 2026 [3]. Major companies including Google, Meta, Microsoft, and Amazon have transitioned from customers to infrastructure owners, with Google notably investing in the Unity cable consortium in 2010 [3]. This shift represents a revolutionary change in the telecommunications industry as content networks now deploy more international capacity than traditional internet backbone providers [3].
References
- Lightstorm Combines Indian Fiber with I-2SEA Subsea Cable (Converge Digest)
- MDM Unveils $500M NARW 1 & NARW 2 Transatlantic Subsea Cable Systems - Submarine Networks (Submarine Networks)
- A (Refreshed) List of Content Providers' Submarine Cable Holdings (TeleGeography blog)
Standing status
Operator-reported state (read directly from each operator's own status page, not summarised by any model):
- AusInternet — network status — INDIGO West
Status: partial service disruption; Fault: shunt fault; Fault location: 65km from Perth Cable Landing Station; Repair ETA: 26 Aug 2026 / 30 Aug 2026 with an ETR on 4 Sep 2026; Delayed until: August 25th; Planned maintenance: Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade / August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM
as at 2026-08-17 00:09 UTC · https://ausinternet.com.au/status/ - Global Secure Layer — network status
Status: partial outage
as at 2026-08-17 00:09 UTC · https://status.gslnetworks.com.au - SUBCO — INDIGO West — INDIGO West
as at 2026-08-16 04:00 UTC · https://sub.co/indigo-west/ - SUBCO — Oman Australia Cable, INDIGO Central, INDIGO West, SMAP
Status: monitoring
as at 2026-08-17 20:11 UTC · https://sub.co - Telstra — service status
Status: monitoring
as at 2026-08-15 13:31 UTC · https://www.telstra.com.au/exchange - Vocus — network status
Status: operational; Affected system: route "Behind the Horizon cable route: Building more than
as at 2026-08-15 13:31 UTC · https://www.vocus.com.au
Cable systems shown are those named anywhere on the captured page, matched against the systems tracked in geofences.yaml. A named system is not by itself a claim that it is the affected one.
Changes in the last 7 days:
2026-08-16 21:08AusInternet — network status — Planned maintenance: Data Centres → Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade2026-08-16 21:08AusInternet — network status — Planned maintenance: Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade → August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM2026-08-16 21:08AusInternet — network status — Planned maintenance: August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM → August 18, 2026 11:00PM - 7:00AM AEST August 18, 2026 1:00PM - 9:00PM2026-08-16 21:08AusInternet — network status — Planned maintenance: August 18, 2026 11:00PM - 7:00AM AEST August 18, 2026 1:00PM - 9:00PM → August 19, 2026 11:00PM - 7:00AM AEST August 19, 2026 1:00PM - 9:00PM2026-08-16 21:08AusInternet — network status — Planned maintenance: August 19, 2026 11:00PM - 7:00AM AEST August 19, 2026 1:00PM - 9:00PM → August 20, 2026 2:00AM - 8:00AM AEST August 19, 2026 4:00PM - 10:00PM2026-08-16 13:12AusInternet — network status — Planned maintenance: Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade → Data Centres2026-08-16 13:12AusInternet — network status — Planned maintenance: August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM → Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade2026-08-16 13:12AusInternet — network status — Planned maintenance: August 16, 2026 11:00PM - 7:00AM AEST August 16, 2026 1:00PM - 9:00PM → August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM2026-08-15 15:09AusInternet — network status — Status: service disruption → partial service disruption
Incident threads:
other— 48 documents, last 2026-08-15 (quiet 3d)perth_indigo_2026_08(INDIGO West, INDIGO Central) — 9 documents, last 2026-08-15 (quiet 3d)
Collection: 451 successful fetches in 24h, 16 errors across 8 source(s). Generated 2026-08-17 20:22 UTC.