---
date: 2026-08-17
issue: 24
title: Lightstorm Secures Debt Facility for I-2SEA AI Superhighway Project
standfirst: The project aims to link Indian AI infrastructure to Singapore and Malaysia
  via a 3,600-km submarine cable system. Lightstorm, the majority owner of I-2SEA,
  expects the system to be Ready-for-Service by Q4 2029.
jurisdictions:
- IN
- SG
- MY
- IE
- US
- GB
tags: []
vertical: indigo
---

Lightstorm has secured a ₹2,500 crore debt facility from IndusInd Bank to develop an 'AI Superhighway' connecting India's AI infrastructure to Singapore and Malaysia [1]. The project integrates a terrestrial network across southern India with the 3,600-km I-2SEA submarine cable system, which lands in Machilipatnam and South Chennai [1]. This development marks a shift toward treating subsea capacity as a single integrated architecture designed for the low-latency requirements of distributed GPU environments [1].

## Transatlantic Expansion via Ireland

McMahon Design and Management Ltd (MDM) announced plans to construct the NARW 1 and NARW 2 transatlantic fiber-optic cable systems, representing a US$500 million investment [2]. NARW 1 is intended to connect Galway, Ireland to Long Island, NY, USA with a target Ready for Service (RFS) date of Q3 2029, while NARW 2 will connect Southern Ireland to New Jersey, USA by 2030 [2]. These projects, alongside MDM's management of the PISCES, IRIS, Rockabill, and Scylla systems, aim to establish Ireland as a primary gateway for high-capacity, low-latency connectivity between the United States and mainland Europe [2].

## Content Provider Infrastructure Expansion

TeleGeography reports that content providers have become the dominant users of international capacity, with their bandwidth growth outpacing all other user categories [3]. The number of submarine cables owned by these providers is projected to grow from 20 in 2017 to over 60 by 2026 [3]. Major companies including Google, Meta, Microsoft, and Amazon have transitioned from customers to infrastructure owners, with Google notably investing in the Unity cable consortium in 2010 [3]. This shift represents a revolutionary change in the telecommunications industry as content networks now deploy more international capacity than traditional internet backbone providers [3].

## References

1. [Lightstorm Combines Indian Fiber with I-2SEA Subsea Cable](https://convergedigest.com/lightstorm-ai-superhighway-india-i2sea-financing/) (Converge Digest)
2. [MDM Unveils $500M NARW 1 & NARW 2 Transatlantic Subsea Cable Systems - Submarine Networks](https://www.submarinenetworks.com/en/systems/trans-atlantic/narw/mdm-unveils-nrrw1-narw2) (Submarine Networks)
3. [A (Refreshed) List of Content Providers' Submarine Cable Holdings](https://resources.telegeography.com/telegeography-content-providers-submarine-cable-holdings-list-new) (TeleGeography blog)

---

## Standing status

**Operator-reported state** (read directly from each operator's own status page, not summarised by any model):

- **AusInternet — network status** — **INDIGO West**  
  Status: partial service disruption; Fault: shunt fault; Fault location: 65km from Perth Cable Landing Station; Repair ETA: 26 Aug 2026 / 30 Aug 2026 with an ETR on 4 Sep 2026; Delayed until: August 25th; Planned maintenance: Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade / August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM  
  <sub>as at 2026-08-17 00:09 UTC · https://ausinternet.com.au/status/</sub>
- **Global Secure Layer — network status**  
  Status: partial outage  
  <sub>as at 2026-08-17 00:09 UTC · https://status.gslnetworks.com.au</sub>
- **SUBCO — INDIGO West** — **INDIGO West**  
  <sub>as at 2026-08-16 04:00 UTC · https://sub.co/indigo-west/</sub>
- **SUBCO** — **Oman Australia Cable, INDIGO Central, INDIGO West, SMAP**  
  Status: monitoring  
  <sub>as at 2026-08-17 20:11 UTC · https://sub.co</sub>
- **Telstra — service status**  
  Status: monitoring  
  <sub>as at 2026-08-15 13:31 UTC · https://www.telstra.com.au/exchange</sub>
- **Vocus — network status**  
  Status: operational; Affected system: route "Behind the Horizon cable route: Building more than  
  <sub>as at 2026-08-15 13:31 UTC · https://www.vocus.com.au</sub>

<sub>Cable systems shown are those named anywhere on the captured page, matched against the systems tracked in `geofences.yaml`. A named system is not by itself a claim that it is the affected one.</sub>

**Changes in the last 7 days:**

- `2026-08-16 21:08` AusInternet — network status — Planned maintenance: Data Centres → **Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade**
- `2026-08-16 21:08` AusInternet — network status — Planned maintenance: Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade → **August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM**
- `2026-08-16 21:08` AusInternet — network status — Planned maintenance: August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM → **August 18, 2026 11:00PM - 7:00AM AEST August 18, 2026 1:00PM - 9:00PM**
- `2026-08-16 21:08` AusInternet — network status — Planned maintenance: August 18, 2026 11:00PM - 7:00AM AEST August 18, 2026 1:00PM - 9:00PM → **August 19, 2026 11:00PM - 7:00AM AEST August 19, 2026 1:00PM - 9:00PM**
- `2026-08-16 21:08` AusInternet — network status — Planned maintenance: August 19, 2026 11:00PM - 7:00AM AEST August 19, 2026 1:00PM - 9:00PM → **August 20, 2026 2:00AM - 8:00AM AEST August 19, 2026 4:00PM - 10:00PM**
- `2026-08-16 13:12` AusInternet — network status — Planned maintenance: Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade → **Data Centres**
- `2026-08-16 13:12` AusInternet — network status — Planned maintenance: August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM → **Indigo West (Perth-Singapore) Shunt Fault Repairs and System Upgrade**
- `2026-08-16 13:12` AusInternet — network status — Planned maintenance: August 16, 2026 11:00PM - 7:00AM AEST August 16, 2026 1:00PM - 9:00PM → **August 15, 2026 10:00AM - 11:59PM AEST August 15, 2026 12:00AM**
- `2026-08-15 15:09` AusInternet — network status — Status: service disruption → **partial service disruption**

**Incident threads:**

- `other` — 48 documents, last 2026-08-15 (quiet 3d)
- `perth_indigo_2026_08` (INDIGO West, INDIGO Central) — 9 documents, last 2026-08-15 (quiet 3d)

<sub>Collection: 451 successful fetches in 24h, 16 errors across 8 source(s). Generated 2026-08-17 20:22 UTC.</sub>
