---
date: 2026-11-18
issue: 117
title: Quad Nations Sign Declaration to Secure AI Infrastructure and Supply Chains
standfirst: Australia, India, and Japan joined the United States in affirming support
  for US-led development of 'super intelligence.' The move aims to establish a global
  supply chain for AI hardware and infrastructure that specifically excludes China.
jurisdictions:
- AU
- US
- IN
- JP
- PH
- CN
tags: []
vertical: cablewatch
---

## Situation

- **Australia Singapore Cable**: open since 4 Sep, 75 days, per Global Secure Layer. Operator status: Monitoring.  
  Latest update, 6 Nov 02:37 UTC (12 days ago): “Update from Vocus: Vocus continues to progress restoration activities following the Australia Singapore Cable (ASC) fault, with marine repair operations having commenced at the ASC fault location. The repair vessel successfully commenced cable recovery operations, with one end of the damaged cable recovered onboard. During repair operations, a crew member of the repair vessel required urgent medical attention. …”
- **Australia Singapore Cable**: first update on the page 23 Sep, per Vocus.  
  Latest update, 25 Sep 07:45 UTC (54 days ago): “Vocus continues to progress restoration and repair activities following the Australia Singapore Cable (ASC) fault. Layer 2 Ethernet services restored via the Perth to Singapore path through Jakarta remain operational, and Internet traffic continues to be managed across alternate paths where this delivers the best customer experience. Traffic originating from Perth on ASC towards Port Hedland, Christmas Island and Anyer, Indonesia remains stable and operational. …”  
  <sub>Vocus's page has not been checked since 2026-11-12; this may be out of date.</sub>
- **Measured route**: Perth to Oman [RECOVERY] at 17 Nov 20:00 UTC — DIRECT_LOST has cleared: two consecutive hours back to normal. The only system leaving Australia for this destination is Oman Australia Cable (OAC) (TeleGeography).
- **Measured route**: Sydney to Fiji [RECOVERY] at 18 Nov 00:00 UTC — DIRECT_LOST has cleared: two consecutive hours back to normal. Systems serving this route: Southern Cross Cable Network (SCCN), Southern Cross NEXT (TeleGeography). The measurement cannot say which one moved.
- **Measured corridor** (RIPE Atlas traceroute between fixed anchors, best path over 24 hours; baseline is the corridor's best sustained path over 89 days): Sydney to Singapore best path 94.6ms, typical path up 12.9ms per probe against its own history.
- **Elsewhere**: Cloudflare Radar lists no outage with a cable cut as its cause, open or ended in the last 3 days, anywhere in the world.

<sub>No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. No operator has posted an update or a new notice on these since the last brief (17 Nov 16:04 UTC). Lines marked Elsewhere are Cloudflare Radar's own outage annotations, from anywhere in the world, with the cause as Radar labels it; this archive attributes nothing to anyone. Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.</sub>

## Executive summary

- Australia, India, and Japan joined the US in signing the San Francisco Declaration to secure AI supply chains and infrastructure [1].
- The HCSS assesses that state actors may use gray-zone tactics to disguise sabotage as commercial accidents in Indo-Pacific chokepoints [4].
- MCMC approved the SALAM Part 1 project, a 5,500-kilometer system connecting Peninsular Malaysia, Sarawak, and Sabah starting December 2026 [16].
- A consortium has begun marine surveys for the ReuNION cable to link La Reunion and South Africa by 2027 and 2028 [15].
- FPT Telecom's board passed a resolution to jointly invest in the Vietnam-Singapore Submarine Cable (VTS) project [14].

## Today

Australia, India, and Japan joined the United States in signing the San Francisco Declaration to strengthen controls on sensitive technologies and infrastructure [1]. This initiative, part of the US-led Pax Silica project, seeks to secure critical AI supply chains and hardware while explicitly excluding China from the network [1]. The move positions Australia as a key partner in securing the minerals and rare earths required for these systems [1].

## Suspected interference and anchor drag

Hong Kong prosecutors have withdrawn a criminal damage charge against Chinese captain Wan Wenguo regarding the October 2023 damage to a Baltic connector pipeline and submarine telecom cables in the Gulf of Finland [3]. The Department of Justice cited insufficient evidence for the withdrawal, while local media reported that authorities were unable to contact key witnesses from mainland China [3]. The vessel involved, the 169-metre-long Newnew Polar Bear, was identified as having insufficient anchors and failing to provide daily reports [3].

Analysis from the Hague Centre for Strategic Studies (HCSS) identifies high-risk chokepoints in the Indo-Pacific, including the Luzon Strait, South China Sea, Strait of Malacca, Red Sea, and waters around Taiwan and Japan [4]. The HCSS assessment suggests that state actors may use gray-zone tactics to disguise sabotage as commercial accidents, and the think tank recommends 'deterrence by denial' strategies such as fusing naval AIS with private telemetry and expanding allied-flagged repair vessel capacity [4]. Additionally, a discussion on military-stuff.org highlights how Russia and China may utilize shadow fleets and plausible deniability to target infrastructure in sensitive zones like the Baltic Sea [2].

## Undersea Defense Technology and Infrastructure Security

Rear Admiral Steven Tiffen stated that the inaugural UDT Australia undersea defence technology conference, scheduled for December 2026 in Adelaide, aims to shift the national debate from a submarine-centric view to a broader undersea enterprise [7]. This shift includes a focus on autonomy, seabed infrastructure, sensing, and workforce development to address the growing undersea contest in the Indo-Pacific [7]. Meanwhile, the European Parliament President Roberta Metsola highlighted at the Schuman Security and Defence Forum 2026 that Europe faces increased hybrid warfare targeting undersea infrastructure and communications [8]. 

In the commercial sector, Belgian marine contractor DEME has ordered two uncrewed offshore survey vessels from Dutch technology specialist DEMCON Unmanned Systems [9]. These vessels are based on the DUS OV platform, which features a DNV type-approved design for autonomous operations [9]. Separately, a meeting between Chilean President José Antonio Kast and Chinese President Xi Jinping in Shenzhen occurred amidst ongoing tensions regarding US security concerns over Chinese infrastructure in Chilean waters [6].

## Regional Infrastructure Resilience and Connectivity Initiatives

Nigeria's Federal Ministry of Communications, Innovation and Digital Economy has proposed a shared West African protocol to coordinate the protection and repair of submarine cables [10, 11]. Communications Minister Bosun Tijani presented the advocacy initiative at the PP-26 meeting in Doha, aiming to establish a common framework for rerouting network traffic and reducing dependence on limited international routes [10, 11]. While the proposal does not currently include a legal framework or operational procedures, Nigeria plans to host the International Submarine Cable Resilience Summit in Abuja in February 2025 to further these goals [11].

Separately, industry leaders at the WBBA Broadband Development Congress Africa 2026 in Cape Town called for a borderless, terrestrial fibre backbone to improve network resilience and support AI ambitions across the continent [12]. This discussion included the launch of the ION-2030 initiative, which aims to develop next-generation fixed networks, alongside specific goals such as Tanzania's plan to connect all eight neighbors to the Indian Ocean by April 2027 [12]. Meanwhile, a post on helfrich.substack.com argues that despite advancements in sensing and dashboards, global logistics still lack true decision autonomy, as evidenced by the human intervention required to manage the 78-day reopening of the Port of Baltimore and Maersk's rerouting of vessels around the Cape of Good Hope [13].

## Regional Infrastructure Expansion and AI Export Hubs

The Malaysian Communications and Multimedia Commission (MCMC) has approved TM Technology Services Sdn Bhd to deliver the SALAM Part 1 submarine cable project, a 5,500-kilometer system connecting Peninsular Malaysia, Sarawak, and Sabah [16]. The project, which has a scheduled start date of December 15, 2026, includes 10 new landing stations and aims to provide a resilient alternative route as existing cable-network utilization reaches 85 percent [16]. Meanwhile, FPT Telecom's board passed a resolution on November 12, 2026, to jointly invest in the Vietnam-Singapore Submarine Cable (VTS) project, which was originally launched in April 2024 by Viettel and Singtel [14].

In the Indian Ocean, a consortium of six companies, La Reunion Connectee, Orange, Free, Reunicable, Telco OI, and Zeop, has begun marine surveys for the ReuNION (Reunion New Indian Ocean Network) submarine cable [15]. The project intends to establish a 16 fiber pair link between La Reunion and South Africa, with deployment scheduled for 2027 and 2028 [15]. Additionally, China has opened a $150 million AI export hub in Shantou at a China Telecom submarine cable landing station, utilizing Huawei's Ascend 950DT chips to process foreign queries locally [18].

## References

1. [Trump's AI push has Albanese's signature, but another country is quickly gaining ground](https://www.sbs.com.au/news/article/trump-ai-push-albanese-diplomacy/i5wnsthq0) (sbs.com.au)
   Published: 17 Nov 2026 · sbs.com.au · Claim type: official_statement · Subject: policy, analysis · Jurisdictions: AU, US, IN, JP, PH, CN
2. [Is Europe ready for undersea sabotage? | Anatomy of Disinformation](https://www.military-stuff.org/is-europe-ready-for-undersea-sabotage-anatomy-of-disinformation/) (military-stuff.org)
   Published: 17 Nov 2026 · military-stuff.org · Claim type: analyst_assessment · Subject: analysis, seabed_security, precedent · Jurisdictions: INT, TW
3. [Hong Kong drops charge against captain over Baltic pipeline damage | The Manila Times](https://manilatimes.net/2026/11/18/world/asia-oceania/hong-kong-drops-charge-against-captain-over-baltic-pipeline-damage/2473128) (manilatimes.net)
   Published: 18 Nov 2026 · manilatimes.net · Claim type: official_statement · Subject: investigation, precedent · Systems named: submarine telecom cables · Vessels named: Newnew Polar Bear · Jurisdictions: HK, FI, EE, CN
4. [Securing the Depths: HCSS Strategies for Critical Undersea Infrastructure in the Indo-Pacific](https://www.submarinenetworks.com/en/nv/insights/hcss-strategies-for-critical-undersea-infrastructure-in-the-indo-pacific) (Submarine Networks)
   Published: 17 Nov 2026 · submarinenetworks.com · Claim type: analyst_assessment · Subject: analysis, policy, seabed_security · Jurisdictions: EU, ID, IN, TW, INT
5. [BIMSTEC nations deliberate on protecting critical underwater infrastructure at maritime security meet](https://www.thehawk.in/news/international-relations/bimstec-nations-deliberate-on-protecting-critical-underwater-infrastructure-at-maritime-security-meet) (thehawk.in)
   Not cited in the text · Published: 17 Nov 2026 · thehawk.in · Claim type: official_statement · Subject: policy, seabed_security · Jurisdictions: INT
6. [Chilean President Kast meets Xi Jinping in Shenzhen, South China Morning Post](https://ua.news/en/dovkolo-svitu/prezident-chili-kast-zustrivsia-z-si-tszinpinom-u-shenchzheni-south-china-morning-post) (ua.news)
   Published: 17 Nov 2026 · ua.news · Claim type: official_statement · Subject: policy, seabed_security · Jurisdictions: CL, CN, US
7. [UDT Australia 2026: Conference Discussions to be Catalyst for Converting Australian Debate on Undersea Warfare](https://www.navalnews.com/naval-news/2026/11/udt-australia-2026-undersea-warfare-debate/) (navalnews.com)
   Published: 17 Nov 2026 · navalnews.com · Claim type: analyst_assessment · Subject: analysis, policy, seabed_security · Jurisdictions: AU, INT
8. [Schuman Security and Defence Forum 2026, Welcoming remarks by Roberta Metsola, President of the European Parliament; Keynote speech by Kaja Kallas, High Representative for ...](https://www.contexte.com/resources/transcripts/schuman-security-and-defence-forum-2026-welcoming-remarks-by-roberta-metsola-president-of-the-european-parliament-keynote-speech-by-kaja-kallas-high-representative-for-foreign-affairs-and-security-policy-and-vice-president-of-the-ec_5858) (contexte.com)
   Published: 18 Nov 2026 · contexte.com · Claim type: official_statement · Subject: analysis, seabed_security · Jurisdictions: EU, UA
9. [DEME orders pair of autonomous offshore survey vessels](https://splash247.com/deme-orders-pair-of-autonomous-offshore-survey-vessels/) (Splash 247)
   Published: 18 Nov 2026 · splash247.com · Claim type: confirmed_fact · Subject: seabed_security · Vessels named: DUS OV · Jurisdictions: BE, NL
10. [Nigeria Proposes West African Cable Protocol](https://subtelforum.com/nigeria-proposes-west-african-cable-protocol/) (Submarine Telecoms Forum)
   Published: 17 Nov 2026 · subtelforum.com · Claim type: official_statement · Subject: policy · Jurisdictions: NG, INT
11. [Internet Blackouts: Nigeria Seeks Joint Regional Submarine Cable Protection, Repairs, The Whistler Newspaper](https://thewhistler.ng/internet-blackouts-nigeria-seeks-joint-regional-submarine-cable-protection-repairs) (thewhistler.ng)
   Published: 17 Nov 2026 · thewhistler.ng · Claim type: official_statement · Subject: policy · Jurisdictions: NG, INT
12. [Broadband leaders at WBBA push for borderless fibre to power Africa’s AI](https://lifestyleandtech.co.za/ai-cloud/article/2026-11-18/broadband-leaders-at-wbba-push-for-borderless-fibre-to-power-africas-ai) (lifestyleandtech.co.za)
   Published: 18 Nov 2026 · lifestyleandtech.co.za · Claim type: analyst_assessment · Subject: policy, analysis · Jurisdictions: KE, ZA, NG, TZ, GH, INT
13. [Baltimore Took 78 Days. The Cape Added 4,000 Miles. That Still Isn’t Decision Autonomy](https://helfrich.substack.com/p/baltimore-took-78-days-the-cape-added) (helfrich.substack.com)
   Published: 18 Nov 2026 · helfrich.substack.com · Publisher: self-published, not an official or analyst source · Claim type: analyst_assessment (the document's own framing, not the publisher's standing) · Subject: analysis · Systems named: AAE-1, EIG, SEACOM/TGN · Jurisdictions: INT
14. [FPT Telecom Backs Vietnam-Singapore Cable](https://subtelforum.com/fpt-telecom-backs-vietnam-singapore-cable/) (Submarine Telecoms Forum)
   Published: 17 Nov 2026 · subtelforum.com · Claim type: official_statement · Subject: policy · Systems named: Vietnam-Singapore Submarine Cable, VTS, ALC, VMX · Jurisdictions: VN, SG
15. [ReuNION Begins Marine Surveys for South Africa Link](https://subtelforum.com/reunion-begins-marine-surveys-for-south-africa-link/) (Submarine Telecoms Forum)
   Published: 18 Nov 2026 · subtelforum.com · Claim type: official_statement · Subject: policy · Systems named: ReuNION · Jurisdictions: FR, ZA, SG, MU, MG, YT (+5 more)
16. [TM Tech Receives SALAM Cable Project Approval](https://subtelforum.com/tm-tech-receives-salam-cable-project-approval/) (Submarine Telecoms Forum)
   Published: 17 Nov 2026 · subtelforum.com · Claim type: official_statement · Subject: policy, analysis · Systems named: SALAM Part 1 · Jurisdictions: MY
17. [WireMasters Partners With OSCG, Expands Cable Gland Offerings](https://marinelink.com/news/wiremasters-partners-oscg-expands-cable-544420) (marinelink.com)
   Not cited in the text · Published: 17 Nov 2026 · marinelink.com · Claim type: official_statement · Subject: policy · Jurisdictions: KR
18. [China opens first Huawei-powered AI export hub - Pravda EN](https://news-pravda.com/world/2026/11/18/2753160.html) (news-pravda.com)
   Published: 18 Nov 2026 · news-pravda.com · Publisher: republishes other outlets, not independent corroboration · Claim type: confirmed_fact (the claim it relays, not the publisher) · Subject: policy · Jurisdictions: CN

---

## Standing status

**Operator incident timelines** (quoted from each operator's own status page, not summarised by any model):

- **Australia Singapore Cable** · Global Secure Layer — network status · Monitoring, open since 4 Sep
  - `6 Nov 02:37 UTC` Monitoring: Update from Vocus: Vocus continues to progress restoration activities following the Australia Singapore Cable (ASC) fault, with marine repair operations having commenced at the ASC fault location. The repair vessel successfully commenced cable recovery operations, with one end of the damaged cable recovered onboard. During repair operations, a crew member of the repair vessel required urgent medical attention. …
  <sub>page last checked 2026-11-18 15:07 UTC · https://status.gslnetworks.com.au/incidents/wqmz5wt7l8qj</sub>
- **Australia Singapore Cable** · Vocus — ASC repair update · first update on the page 23 Sep
  - `25 Sep 07:45 UTC` Update: Vocus continues to progress restoration and repair activities following the Australia Singapore Cable (ASC) fault. Layer 2 Ethernet services restored via the Perth to Singapore path through Jakarta remain operational, and Internet traffic continues to be managed across alternate paths where this delivers the best customer experience. Traffic originating from Perth on ASC towards Port Hedland, Christmas Island and Anyer, Indonesia remains stable and operational. Temporary restoration measures remain in place for affected services between Australia and Singapore. We continue to work with partners in Jakarta to manage intermittent instability associated with third-party network infrastructure. The new 100G path between Japan and Guam is in service, providing additional capacity to support Internet traffic into Asia and Europe and reducing reliance on longer alternate paths. This additional capacity further strengthens the temporary restoration arrangements in place while the permanent ASC repair progresses. Testing completed from the Perth and Singapore landing stations continues to indicate a cable break within Indonesian waters, approximately 615 km from the Singapore landing station. Restoring services remains our highest priority, and Vocus continues to work closely with our marine repair partner and relevant authorities to progress the repair program. As previously noted, Vocus agreed to sequence the repair of Indigo West ahead of ASC to provide the best overall restoration outcome for customers. Repairing ASC requires the affected section of the system to be powered down, which would temporarily remove capacity currently supporting restored services via Jakarta and place additional demand on alternate Internet paths. Restoring Indigo West first provides an additional diverse path between Australia and Asia, allowing affected customer services and Internet traffic to be rerouted before ASC is taken offline for its permanent repair. Planning for the marine repair operation continues. The repair vessel will depart Singapore on 11 October, and the Indigo West repair is expected to be completed around 24 October. The vessel is then expected to transit to the ASC repair location, with marine repair activities for ASC planned to start around 25 October. Based on the current repair schedule, completion of the ASC repair remains targeted for 4 November. Additional contingency has been incorporated into the marine program should conditions affect the planned repair activities. A key dependency of the repair remains completion of the required Indonesian operational permits and clearances. Documentation and approval activities are progressing with the relevant authorities and are part of the pre-repair program. Subsea cable repairs are complex and remain subject to a number of factors outside Vocus' direct control. The current schedule is dependent on permitting and regulatory approvals, completion of the preceding Indigo West repair, vessel movements, local sea and weather conditions, and the condition of the cable once recovered. While every effort will be made to complete the work within the planned timeframe, these dates may change if operational conditions require. Vocus will continue to closely monitor temporary restoration paths and available international capacity while the marine repair program progresses, and will provide further updates as key milestones are reached.
  <sub>page last checked 2026-11-12 19:42 UTC · https://www.vocus.com.au/news/update-on-repairs-to-australia-singapore-cable</sub>

<sub>Also polled for changes, but carrying no incident listing, so nothing is said about their state: ACMA protection zone — Perth, ACMA protection zone — Sydney, AJC — cable system maintenance, AJC — news, SUBCO, SUBCO — INDIGO West, SUBCO — OAC, Southern Cross Cable Network, Telstra — service status, Vocus — network status.</sub>

**Incident threads:**

- `perth_indigo_2026_08` (INDIGO West, INDIGO Central) — 18 documents, last 2026-11-02 (quiet 17d)

**Measured corridors** (RIPE Atlas traceroute between fixed anchors over 24h, no model involved):

- **perth to singapore** — best path 47.2ms; typical path 238.3ms (+0.8ms per probe against its own history, 21 probes); ocean crossing 47.0ms; queuing 0.5ms; 89 days of history; clean crossing (21 probe(s), 17 reading(s) excluded as below the corridor's physical floor)
- **sydney to japan** — best path 100.5ms; typical path 142.7ms (+8.9ms per probe against its own history, 17 probes); ocean crossing 132.5ms; queuing 0.5ms; steady against 89 days of history; clean crossing (17 probe(s), 23 reading(s) excluded as below the corridor's physical floor)
- **sydney to nz** — best path 24.7ms; typical path 29.5ms (+0.1ms per probe against its own history, 8 probes); ocean crossing 27.9ms; queuing 0.2ms; steady against 89 days of history; clean crossing (8 probe(s))
- **sydney to singapore** — best path 94.6ms; typical path 238.5ms (+12.9ms per probe against its own history, 21 probes); ocean crossing 118.2ms; queuing 0.6ms; 89 days of history; 2 intervening hop(s) included (21 probe(s))

<sub>A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. A corridor's baseline is its best sustained path over the days of history shown, a different figure from a route's physical floor below. As data: https://cablewatch.liminallayers.com/data/corridors.json.</sub>

**Every cable route leaving the mainland** (measured hourly, no model involved):

- **Australia to Guam** — best 70.6ms against a 52.0ms physical floor; 7/24 paths direct (normally 12) <br><sub>Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S), PIPE Pacific Cable-1 (PPC-1)</sub>
- **Dili to Australia** — best 49.8ms against a 7.1ms physical floor; 3 paths measured <br><sub>Timor-Leste South Submarine Cable (TLSSC), North-West Cable System</sub>
- **Melbourne to Tasmania** — best 9.6ms against a 5.9ms physical floor; 8/17 paths direct (normally 8) <br><sub>Basslink, Bass Strait-1, Bass Strait-2</sub>
- **Perth to Jakarta** — best 57.6ms against a 29.5ms physical floor; 40 paths measured <br><sub>INDIGO-West, Australia-Singapore Cable (ASC)</sub>
- **Perth to Oman** — best 106.1ms against a 85.0ms physical floor; 2/4 paths direct (normally 2) <br><sub>Oman Australia Cable (OAC) · only system on this route</sub>
- **Perth to Singapore** — best 46.0ms against a 38.3ms physical floor; 30/64 paths direct (normally 31) <br><sub>INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC)</sub>
- **Sydney to Fiji** — best 37.0ms against a 31.5ms physical floor; 5/6 paths direct (normally 6) <br><sub>Southern Cross Cable Network (SCCN), Southern Cross NEXT</sub>
- **Sydney to Hawaii** — best 194.7ms against a 80.0ms physical floor; 2 paths measured <br><sub>Telstra Endeavour, Southern Cross Cable Network (SCCN), Hawaiki</sub>
- **Sydney to Honiara** — best 38.4ms against a 28.0ms physical floor; 2/2 paths direct (normally 2) <br><sub>Coral Sea Cable System (CS²) · only system on this route</sub>
- **Sydney to Japan** — best 99.2ms against a 76.7ms physical floor; 22/108 paths direct (normally 28) <br><sub>Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S)</sub>
- **Sydney to New Zealand** — best 23.4ms against a 21.1ms physical floor; 43/65 paths direct (normally 48) <br><sub>Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Tasman Global Access (TGA) Cable</sub>
- **Sydney to Noumea** — best 22.4ms against a 19.3ms physical floor; 5/9 paths direct (normally 5) <br><sub>Gondwana-1 · only system on this route</sub>
- **Sydney to Port Moresby** — best 37.7ms against a 26.9ms physical floor; 3/6 paths direct (normally 3) <br><sub>Coral Sea Cable System (CS²), PIPE Pacific Cable-1 (PPC-1)</sub>
- **Sydney to US West Coast** — best 135.9ms against a 118.3ms physical floor; 179/303 paths direct (normally 249) <br><sub>Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Telstra Endeavour</sub>

<sub>A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in https://cablewatch.liminallayers.com/data/coverage.json.</sub>

<sub>Collection: 592 successful fetches in 24h, 40 errors across 15 source(s). Generated 2026-11-18 16:04 UTC.</sub>
