← Cable Watch

14 November 2026 · Issue 113

Norwegian Intelligence Warns of Potential Russian Infrastructure Sabotage in 2027

The Norwegian Police Security Service (PST) identifies energy and defense sectors as primary targets for Russian intelligence operations. The assessment follows reports of Russian technology testing aimed at disabling undersea cables.

Markdown · Transcript · MP3 · Subscribe

Situation

No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. No operator has posted an update or a new notice on these since the last brief (13 Nov 16:04 UTC). Lines marked Elsewhere are Cloudflare Radar's own outage annotations, from anywhere in the world, with the cause as Radar labels it; this archive attributes nothing to anyone. Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.

Executive summary

Today

The Norwegian Police Security Service (PST) issued a threat assessment [1] stating that Russian intelligence agencies are likely to conduct sabotage operations against Norwegian infrastructure in 2027. While no direct sabotage attempts have been detected yet, the PST identified defense contractors, military logistics, and energy companies as primary targets following reports of Russian technology testing to disable undersea cables [1].

Power Cable Deployment and Infrastructure Expansion

The Seaway Phoenix, a vessel converted from an internet cable layer to a power cable ship, has begun unspooling 311 miles of Hornsea 3 inter-array cables for Ørsted's wind farm off the British coast [2]. Operated by Seaway7, the ship is connecting 197 turbines to two offshore converter stations to facilitate a 2.9 GW capacity project [2]. This operation marks the first time Ørsted is using high-voltage direct current in Europe, which is intended to provide electricity for more than 3.3 million UK homes once completed [2].

Regional Infrastructure Sabotage and Maritime Security

Iranian security officials and IRGC spokespeople have reportedly mapped plans to sever seven major submarine cables beneath the Strait of Hormuz and block repair vessels if hostilities with the U.S. and Israel resume [4]. The strategy, according to brinztech.com, includes targeting US-linked data centers and AI facilities in the UAE and Bahrain as asymmetric choke points to cause regional economic and operational disruption [4].

Separately, a post on ukforcestracker.substack.com reports that the Royal Navy is developing a network of Uncrewed Surface Vessels (USVs), including the SYEOS Aerospace Rattler and Kraken Technology’s K3 Scout and K5 Kraken, to support mine countermeasures and surveillance [5]. The Navy also confirmed plans to join Norway’s P1118 Standardised Vessel Programme to acquire at least three Castle-class Offshore Support Vessels (OSVs) by 2031 to maintain seabed warfare capabilities as conventional minehunters retire [5].

Infrastructure Development and Fault Detection Technology

EXA Infrastructure has selected IT International Telecom Inc. as the marine installation contractor for the EXA Meridian, a 6,552 km transatlantic cable system linking New Jersey, U.S. to Brean, UK [6]. The project, scheduled for service in 2029, will utilize 24 fiber pairs with a 500 Tbps capacity and features a partnership intended to secure dedicated DP2 vessel capacity and seabed protection expertise to mitigate global vessel bottlenecks [6].

Separately, a report on bioengineer.org describes a new physics-grounded sequence-domain graph learning framework designed to improve fault-location accuracy in offshore wind transmission networks [7]. The framework, which combines a graph attention neural network with a three-sequence physics-informed neural network, achieved a mean relative location error of 0.195 percent in simulations involving submarine feeders [7]. This technology aims to improve the speed of identifying high-impedance faults and managing non-linear behaviors in modern wind turbine converters to reduce repair costs and system outages [7].

References

  1. Norwegian Intelligence Warns of Risk of Russian Sabotage Next Year (militarnyi.com)
    Published: 13 Nov 2026 · militarnyi.com · Claim type: official_statement · Subject: analysis, seabed_security · Jurisdictions: NO, RU
  2. A 426-foot ship built to lay internet cable across oceans can now carry about 4,400 tons of power cable on two giant turntables, and it has started unspooling 311 miles of it across the seabed of a ... (autonocion.com)
    Published: 13 Nov 2026 · autonocion.com · Claim type: confirmed_fact · Subject: repair, vessel_activity · Systems named: Hornsea 3 inter-array cables · Vessels named: Seaway Phoenix · Jurisdictions: INT
  3. Taiwan Excellence Quiccs Maiquez collaboration (tribune.net.ph)
    Not cited in the text · Published: 13 Nov 2026 · tribune.net.ph · Claim type: official_statement · Subject: policy, seabed_security · Jurisdictions: TW, PH, CN
  4. Iran Prepares Contingency Plans to Cut Gulf Undersea Internet Cables if Hostilities Resume (brinztech.com)
    Published: 13 Nov 2026 · brinztech.com · Claim type: analyst_assessment · Subject: seabed_security, analysis · Jurisdictions: IR, AE, BH, INT
  5. The future Royal Navy Coastal Force takes shape (ukforcestracker.substack.com)
    Published: 13 Nov 2026 · ukforcestracker.substack.com · Publisher: self-published, not an official or analyst source · Claim type: official_statement (the claim it relays, not the publisher) · Subject: seabed_security · Vessels named: HMS Tyne, HMS Dauntless, HMS Stirling Castle · Jurisdictions: INT
  6. EXA Infrastructure Selects IT International Telecom for Marine Installation of EXA Meridian (Submarine Networks)
    Published: 14 Nov 2026 · submarinenetworks.com · Claim type: official_statement · Subject: policy · Systems named: EXA Meridian, North Shore Submarine Cable, Sunoque III TransGulf Cable, Ocean Networks HIFL Cable, Crosslake Fibre Lake Ontario · Vessels named: IT Intrepid, IT Integrity, IT Infinity · Jurisdictions: US, GB, CA
  7. Physics-Grounded Graph Learning Accurately Locates Faults in Offshore Wind (bioengineer.org)
    Published: 13 Nov 2026 · bioengineer.org · Claim type: analyst_assessment · Subject: analysis · Jurisdictions: INT

Standing status

Operator incident timelines (quoted from each operator's own status page, not summarised by any model):

Also polled for changes, but carrying no incident listing, so nothing is said about their state: ACMA protection zone — Perth, ACMA protection zone — Sydney, AJC — cable system maintenance, AJC — news, SUBCO, SUBCO — INDIGO West, SUBCO — OAC, Southern Cross Cable Network, Telstra — service status, Vocus — network status.

Incident threads:

Measured corridors (RIPE Atlas traceroute between fixed anchors over 24h, no model involved):

A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. A corridor's baseline is its best sustained path over the days of history shown, a different figure from a route's physical floor below. As data: https://cablewatch.liminallayers.com/data/corridors.json.

Every cable route leaving the mainland (measured hourly, no model involved):

A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in https://cablewatch.liminallayers.com/data/coverage.json.

Collection: 589 successful fetches in 24h, 27 errors across 10 source(s). Generated 2026-11-14 16:02 UTC.