Situation
- Australia Singapore Cable: open since 4 Sep, 69 days, per Global Secure Layer. Operator status: Monitoring.
Latest update, 6 Nov 02:37 UTC (6 days ago): “Update from Vocus: Vocus continues to progress restoration activities following the Australia Singapore Cable (ASC) fault, with marine repair operations having commenced at the ASC fault location. The repair vessel successfully commenced cable recovery operations, with one end of the damaged cable recovered onboard. During repair operations, a crew member of the repair vessel required urgent medical attention. …” - Australia Singapore Cable: first update on the page 23 Sep, per Vocus.
Latest update, 25 Sep 07:45 UTC (48 days ago): “Vocus continues to progress restoration and repair activities following the Australia Singapore Cable (ASC) fault. Layer 2 Ethernet services restored via the Perth to Singapore path through Jakarta remain operational, and Internet traffic continues to be managed across alternate paths where this delivers the best customer experience. Traffic originating from Perth on ASC towards Port Hedland, Christmas Island and Anyer, Indonesia remains stable and operational. …” - Measured route: Australia to Guam [DIRECT_LOST] at 11 Nov 19:00 UTC — direct paths down to 6 of the 13 this route normally holds. Best path 70.5ms -> 70.5ms. 5 independent vantages. Systems serving this route: Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S), PIPE Pacific Cable-1 (PPC-1) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Oman [RECOVERY] at 11 Nov 19:00 UTC — DIRECT_LOST has cleared: two consecutive hours back to normal. The only system leaving Australia for this destination is Oman Australia Cable (OAC) (TeleGeography).
- Measured route: Perth to Oman [DIRECT_LOST] at 12 Nov 09:00 UTC — direct paths down to 1 of the 2 this route normally holds. Best path 106.4ms -> 132.8ms. 2 independent vantages. The only system leaving Australia for this destination is Oman Australia Cable (OAC) (TeleGeography).
- Measured corridor (RIPE Atlas traceroute between fixed anchors, best path over 24 hours; baseline is the corridor's best sustained path over 83 days): Perth to Singapore best path 47.2ms, typical path up 37.9ms per probe against its own history; Sydney to Japan best path 100.4ms, typical path up 10.1ms per probe against its own history; Sydney to Singapore best path 94.7ms, typical path up 39.5ms per probe against its own history.
- Elsewhere: Cloudflare Radar lists no outage with a cable cut as its cause, open or ended in the last 3 days, anywhere in the world.
No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. No operator has posted an update or a new notice on these since the last brief (11 Nov 16:04 UTC). Lines marked Elsewhere are Cloudflare Radar's own outage annotations, from anywhere in the world, with the cause as Radar labels it; this archive attributes nothing to anyone. Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.
Executive summary
- Windward assesses that a Chinese research vessel conducted a 53-hour survey pattern over the SEA-H2X and EAC-C2C cable routes [4].
- The Dutch Ministry of Defence stated that naval escorts of Russian vessels serve to demonstrate vigilance against undersea infrastructure sabotage [2].
- Zayo has activated capacity on the Monet subsea cable system to establish a third diverse route between the U.S. and Brazil [10].
- The South Korean Ministry of Science and ICT is reviewing plans for four additional submarine cables by 2030 to meet AI data demands [16].
Today
DXN Limited has secured a A$4.8 million contract to design, supply, and commission a modular Cable Landing Station (CLS) for an unnamed global internet customer at a Pacific region site under US jurisdiction [1]. This marks the company's fourth contract with this specific customer, with delivery scheduled for the first quarter of FY28 [1]. While the reporting window was otherwise quiet, this win highlights a shift toward standardized, prefabricated modular solutions for infrastructure expansion in the region [1].
Maritime Security and Survey Activity
Windward reports that a Chinese research and survey vessel, owned by an institute associated with the Shenyang Institute of Automation, conducted a 53-hour back-and-forth survey pattern over the SEA-H2X and EAC-C2C cable routes in the northern South China Sea between October 30 and November 1 [4]. The vessel also held positions near the APG and SJC2 routes from October 24 to 26, frequently going dark for several hours [4]. Windward's analysis indicates that the vessel's behavior and its ownership by a deep-sea robotics institute are consistent with mapping these specific cable corridors [4].
In Europe, the Dutch Ministry of Defence announced that the Royal Netherlands Navy used hydrographic survey ships HNLMS Luymes and HNLMS Snellius to escort a Russian frigate, a tanker, and two cargo ships through the North Sea from November 4 to 10 [2]. The Netherlands stated these escorts serve as a demonstration of vigilance to prevent the sabotage of undersea infrastructure within its exclusive economic zone [2]. Meanwhile, the Irish government has expanded naval powers to board and inspect suspicious vessels, specifically targeting the 'shadow fleet' of tankers used by Russia to circumvent sanctions, following concerns over the monitoring of the Russian vessel Yantar near Irish and UK undersea infrastructure [3].
Undersea Infrastructure Security and Regional Cooperation
The HCSS is hosting a webinar to discuss strengthening the resilience of critical undersea infrastructure (CUI) in the Indo-Pacific and identifying cooperation opportunities between the EU and South and Southeast Asia [7]. While the webinar does not name specific cable systems or dates, it highlights a policy focus on seabed security in the region [7].
In the Eastern Mediterranean, the French-flagged vessel Abeille Marengo arrived in Crete on October 27 to conduct seabed surveys for the Great Sea Interconnector, an electricity cable connecting Greece and Cyprus [8]. Turkey is demanding advance consultation over operations in waters it claims, while Greece maintains that only Greek authorities can authorize surveys [8]. The project, which is supported by Washington and the EU, faces potential delays or influence from Ankara as it seeks to connect Cyprus to the European grid [8].
International Infrastructure and Resilience Developments
Zayo has activated capacity on the Monet subsea cable system to establish a third diverse route between the U.S. and Brazil, connecting the Miami-São Paulo corridor to Brazilian data centers and the B3 stock exchange [10]. In East Africa, Kenyan President William Ruto discussed the expansion of the Blue Raman Submarine Cable during a meeting with EU delegations to seek deeper security and technology cooperation [11]. Meanwhile, the EU is reviewing recommendations for a secure submarine communications cable connecting Greenland with Europe as part of a broader Arctic strategy to bolster transatlantic communications and infrastructure resilience [13].
Regarding operational capacity and policy, Aventa Group announced the acquisition of Offshore Projects Alliance Ltd (OPA) to strengthen its offshore personnel capacity for subsea cable projects, including route preparation and cable lay [9]. At the ITU PP-26 discussion in Doha, Ghana's Minister for Communication, Digital Technology, and Innovations called for a global 'Dig Once Policy' and a National Emergency Telecommunications Plan to move beyond 'redundancy on paper' following the March 2024 submarine cable failures off the West African coast [12].
AI-Driven Submarine Cable Expansion and Sovereignty
South Korean telecommunications companies and the government are accelerating submarine cable expansion to meet AI-driven data demands, with the Ministry of Science and ICT reviewing plans for four additional cables by 2030 to improve reliability and reduce geographic concentration [16]. KT plans to invest 1 trillion won by 2031 to secure 90 Tbps of capacity and diversify landing stations beyond Busan to Jeju, while SK Broadband is participating in the 12,500-kilometer E2A cable connecting Korea, the US, Japan, and Taiwan [16, 18]. LG Uplus also operates the EAC and C2C systems and expanded US-KR routes in May [16].
Industry analysis from ETRI suggests that carriers must transition into 'AI infrastructure platform companies' by bundling computing, networks, and cloud services to avoid creating 'expensive warehouses' that lack global links [18]. Meanwhile, SAP identifies four dimensions of sovereignty, data, operational, technical, and legal, arguing that true sovereignty requires local personnel and independent control planes beyond simple data residency [14]. In Africa, Kenya's fixed broadband latency (29ms) currently outpaces South Africa's (71ms), though the region remains vulnerable to faults on the Eastern Africa Submarine System and Seacom cables [17].
References
- DXN wins fourth cable landing station contract with global internet customer - techpartner.news (techpartner.news)
Published: 11 Nov 2026 · techpartner.news · Claim type: confirmed_fact · Subject: policy · Systems named: Solomon Islands Submarine Cable Company · Jurisdictions: AU, MY, US · Also reported by: kalkine.com.au - Dutch Navy survey ships escort four Russian vessels through North Sea (bairdmaritime.com)
Published: 11 Nov 2026 · bairdmaritime.com · Claim type: official_statement · Subject: seabed_security, vessel_activity · Vessels named: HNLMS Luymes, HNLMS Snellius, Novorossiysk, Yakov Grebelskiy, DSS Galatea, Admiral Levchenko (+1 more) · Jurisdictions: NL, INT - Ireland fears undersea cables face growing threat from ‘malign actors’ | News | Al Jazeera (aljazeera.com)
Published: 11 Nov 2026 · aljazeera.com · Claim type: analyst_assessment · Subject: seabed_security, analysis, precedent · Vessels named: Yantar · Jurisdictions: IE, GB, FI, EE, RU · Also reported by: ua.news - A Chinese Survey Vessel Spent 53 Hours Over the SEA-H2X and EAC-C2C Cables (hellenicshippingnews.com)
Published: 10 Nov 2026 · hellenicshippingnews.com · Claim type: analyst_assessment · Subject: vessel_activity, analysis, seabed_security · Systems named: SEA-H2X, EAC-C2C, APG, SJC2 · Jurisdictions: CN, PH, SG, TH, JP, KR (+1 more) - From Protection to Resilience: Rethinking Critical Maritime Infrastructure Security in Europe? (azureforum.substack.com)
Not cited in the text · Published: 12 Nov 2026 · azureforum.substack.com · Publisher: self-published, not an official or analyst source · Claim type: analyst_assessment (the document's own framing, not the publisher's standing) · Subject: analysis, policy, seabed_security, precedent · Jurisdictions: IE, EU, INT - Norway wants its Type 26 frigates to be interchangeable with the Royal Navy’s - Navy Lookout (navylookout.com)
Not cited in the text · Published: 11 Nov 2026 · navylookout.com · Claim type: official_statement · Subject: seabed_security · Vessels named: HMS Prince of Wales · Jurisdictions: NO, GB, AU, CA, US, RU - HCSS Event | Protecting Critical Undersea Infrastructure in the Indo-Pacific: Opportunities for EU Cooperation with South and Southeast Asia (hcss.nl)
Published: 12 Nov 2026 · hcss.nl · Claim type: analyst_assessment · Subject: policy, analysis, seabed_security · Jurisdictions: AU, SG, ID, TW, INT - The Undersea Cable Testing U.S., Turkey Ties - EIR (eagleintelreports.com)
Published: 12 Nov 2026 · eagleintelreports.com · Claim type: analyst_assessment · Subject: seabed_security, analysis, policy · Systems named: Great Sea Interconnector · Vessels named: Abeille Marengo, Ievoli Relume, Saipem 12000 · Jurisdictions: GR, TR, CY, INT - OPA Joins Aventa to Expand Subsea Cable Crewing (Submarine Telecoms Forum)
Published: 12 Nov 2026 · subtelforum.com · Claim type: official_statement · Subject: policy · Jurisdictions: INT, GB - Zayo Activates Monet Route Between U.S. and Brazil (Submarine Telecoms Forum)
Published: 12 Nov 2026 · subtelforum.com · Claim type: official_statement · Subject: policy · Systems named: Monet, Seabras-1, GlobeNet · Jurisdictions: US, BR - President Ruto seeks deeper EU cooperation as Kenya marks 50 years of diplomatic relations (eastleighvoice.co.ke)
Published: 11 Nov 2026 · eastleighvoice.co.ke · Claim type: official_statement · Subject: policy · Systems named: Blue Raman Submarine Cable · Jurisdictions: KE, EU - Ghana advocates for stronger digital infrastructure resilience at ITU PP-26 (3news.com)
Published: 11 Nov 2026 · 3news.com · Claim type: official_statement · Subject: policy, analysis · Jurisdictions: GH, INT - EU Strengthens Greenland Partnership as Arctic Security Moves Beyond Military Defence (eutoday.net)
Published: 12 Nov 2026 · eutoday.net · Claim type: official_statement · Subject: policy, analysis · Jurisdictions: GL, EU, DK - Sovereignty is not just about where your data is (technologydecisions.com.au)
Published: 11 Nov 2026 · technologydecisions.com.au · Claim type: official_statement · Subject: policy · Jurisdictions: AU - DXN picks up CLS contract worth nearly $5M (arnnet.com.au)
Not cited in the text · Published: 11 Nov 2026 · arnnet.com.au · Claim type: official_statement · Subject: policy · Jurisdictions: AU, INT - Telco Operators Accelerate Submarine Cable Expansion in the AI Era < GLOBAL < 기사본문 - IT조선 (it.chosun.com)
Published: 12 Nov 2026 · it.chosun.com · Claim type: official_statement · Subject: policy, analysis · Systems named: E2A, EAC, C2C · Jurisdictions: KR, US, JP, TW - Kenyan fixed internet outpaces SA (itweb.africa)
Published: 11 Nov 2026 · itweb.africa · Claim type: analyst_assessment · Subject: analysis, policy · Systems named: Eastern Africa Submarine System, Seacom · Jurisdictions: KE, AU, SG, PH, US, ZA (+7 more) - South Korea's Telecom Giants Race to Expand Global Networks as AI Data Centers Without Submarine Cables Become 'Expensive Warehouses' (finance.biggo.com)
Published: 11 Nov 2026 · finance.biggo.com · Claim type: analyst_assessment · Subject: policy, analysis · Systems named: E2A · Jurisdictions: KR, SG, JP, US, TW
Standing status
Operator incident timelines (quoted from each operator's own status page, not summarised by any model):
- Australia Singapore Cable · Global Secure Layer — network status · Monitoring, open since 4 Sep
6 Nov 02:37 UTCMonitoring: Update from Vocus: Vocus continues to progress restoration activities following the Australia Singapore Cable (ASC) fault, with marine repair operations having commenced at the ASC fault location. The repair vessel successfully commenced cable recovery operations, with one end of the damaged cable recovered onboard. During repair operations, a crew member of the repair vessel required urgent medical attention. …
page last checked 2026-11-12 15:11 UTC · https://status.gslnetworks.com.au/incidents/wqmz5wt7l8qj- Australia Singapore Cable · Vocus — ASC repair update · first update on the page 23 Sep
25 Sep 07:45 UTCUpdate: Vocus continues to progress restoration and repair activities following the Australia Singapore Cable (ASC) fault. Layer 2 Ethernet services restored via the Perth to Singapore path through Jakarta remain operational, and Internet traffic continues to be managed across alternate paths where this delivers the best customer experience. Traffic originating from Perth on ASC towards Port Hedland, Christmas Island and Anyer, Indonesia remains stable and operational. Temporary restoration measures remain in place for affected services between Australia and Singapore. We continue to work with partners in Jakarta to manage intermittent instability associated with third-party network infrastructure. The new 100G path between Japan and Guam is in service, providing additional capacity to support Internet traffic into Asia and Europe and reducing reliance on longer alternate paths. This additional capacity further strengthens the temporary restoration arrangements in place while the permanent ASC repair progresses. Testing completed from the Perth and Singapore landing stations continues to indicate a cable break within Indonesian waters, approximately 615 km from the Singapore landing station. Restoring services remains our highest priority, and Vocus continues to work closely with our marine repair partner and relevant authorities to progress the repair program. As previously noted, Vocus agreed to sequence the repair of Indigo West ahead of ASC to provide the best overall restoration outcome for customers. Repairing ASC requires the affected section of the system to be powered down, which would temporarily remove capacity currently supporting restored services via Jakarta and place additional demand on alternate Internet paths. Restoring Indigo West first provides an additional diverse path between Australia and Asia, allowing affected customer services and Internet traffic to be rerouted before ASC is taken offline for its permanent repair. Planning for the marine repair operation continues. The repair vessel will depart Singapore on 11 October, and the Indigo West repair is expected to be completed around 24 October. The vessel is then expected to transit to the ASC repair location, with marine repair activities for ASC planned to start around 25 October. Based on the current repair schedule, completion of the ASC repair remains targeted for 4 November. Additional contingency has been incorporated into the marine program should conditions affect the planned repair activities. A key dependency of the repair remains completion of the required Indonesian operational permits and clearances. Documentation and approval activities are progressing with the relevant authorities and are part of the pre-repair program. Subsea cable repairs are complex and remain subject to a number of factors outside Vocus' direct control. The current schedule is dependent on permitting and regulatory approvals, completion of the preceding Indigo West repair, vessel movements, local sea and weather conditions, and the condition of the cable once recovered. While every effort will be made to complete the work within the planned timeframe, these dates may change if operational conditions require. Vocus will continue to closely monitor temporary restoration paths and available international capacity while the marine repair program progresses, and will provide further updates as key milestones are reached.
page last checked 2026-11-12 13:36 UTC · https://www.vocus.com.au/news/update-on-repairs-to-australia-singapore-cable
Also polled for changes, but carrying no incident listing, so nothing is said about their state: ACMA protection zone — Perth, ACMA protection zone — Sydney, AJC — cable system maintenance, AJC — news, SUBCO, SUBCO — INDIGO West, SUBCO — OAC, Southern Cross Cable Network, Telstra — service status, Vocus — network status.
Incident threads:
perth_indigo_2026_08(INDIGO West, INDIGO Central) — 18 documents, last 2026-11-02 (quiet 11d)
Measured corridors (RIPE Atlas traceroute between fixed anchors over 24h, no model involved):
- perth to singapore — best path 47.2ms; typical path 240.1ms (+37.9ms per probe against its own history, 20 probes); ocean crossing 46.9ms; queuing 0.5ms; 83 days of history; clean crossing (21 probe(s), 5 reading(s) excluded as below the corridor's physical floor)
- sydney to japan — best path 100.4ms; typical path 141.6ms (+10.1ms per probe against its own history, 17 probes); ocean crossing 127.0ms; queuing 0.5ms; steady against 83 days of history; clean crossing (17 probe(s), 30 reading(s) excluded as below the corridor's physical floor)
- sydney to nz — best path 24.7ms; typical path 29.4ms (+0.1ms per probe against its own history, 8 probes); ocean crossing 27.7ms; queuing 0.2ms; steady against 83 days of history; clean crossing (8 probe(s))
- sydney to singapore — best path 94.7ms; typical path 241.8ms (+39.5ms per probe against its own history, 20 probes); ocean crossing 125.2ms; queuing 0.5ms; 83 days of history; 2 intervening hop(s) included (21 probe(s), 2 reading(s) excluded as below the corridor's physical floor)
A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. A corridor's baseline is its best sustained path over the days of history shown, a different figure from a route's physical floor below. As data: https://cablewatch.liminallayers.com/data/corridors.json.
Every cable route leaving the mainland (measured hourly, no model involved):
- Australia to Guam — best 70.5ms against a 52.0ms physical floor; 7/24 paths direct (normally 13)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S), PIPE Pacific Cable-1 (PPC-1) - Dili to Australia — best 52.8ms against a 7.1ms physical floor; 3 paths measured
Timor-Leste South Submarine Cable (TLSSC), North-West Cable System - Melbourne to Tasmania — best 10.0ms against a 5.9ms physical floor; 8/17 paths direct (normally 8)
Basslink, Bass Strait-1, Bass Strait-2 - Perth to Jakarta — best 57.7ms against a 29.5ms physical floor; 37 paths measured
INDIGO-West, Australia-Singapore Cable (ASC) - Perth to Oman — best 133.0ms against a 85.0ms physical floor; 1/4 paths direct (normally 2)
Oman Australia Cable (OAC) · only system on this route - Perth to Singapore — best 46.0ms against a 38.3ms physical floor; 31/64 paths direct (normally 26)
INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) - Sydney to Fiji — best 37.0ms against a 31.5ms physical floor; 5/6 paths direct (normally 6)
Southern Cross Cable Network (SCCN), Southern Cross NEXT - Sydney to Hawaii — best 194.7ms against a 80.0ms physical floor; 2 paths measured
Telstra Endeavour, Southern Cross Cable Network (SCCN), Hawaiki - Sydney to Honiara — best 38.3ms against a 28.0ms physical floor; 2/2 paths direct (normally 2)
Coral Sea Cable System (CS²) · only system on this route - Sydney to Japan — best 99.3ms against a 76.7ms physical floor; 20/108 paths direct (normally 28)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S) - Sydney to New Zealand — best 23.4ms against a 21.1ms physical floor; 43/65 paths direct (normally 48)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Tasman Global Access (TGA) Cable - Sydney to Noumea — best 22.4ms against a 19.3ms physical floor; 2/5 paths direct (normally 5)
Gondwana-1 · only system on this route - Sydney to Port Moresby — best 37.7ms against a 26.9ms physical floor; 3/6 paths direct (normally 3)
Coral Sea Cable System (CS²), PIPE Pacific Cable-1 (PPC-1) - Sydney to US West Coast — best 135.8ms against a 118.3ms physical floor; 173/303 paths direct (normally 281)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Telstra Endeavour
A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in https://cablewatch.liminallayers.com/data/coverage.json.
Collection: 607 successful fetches in 24h, 34 errors across 13 source(s). Generated 2026-11-12 16:05 UTC.