Situation
- Australia Singapore Cable: first update on the page 23 Sep, per Vocus.
Latest update, 25 Sep 07:45 UTC (2 days ago): “Vocus continues to progress restoration and repair activities following the Australia Singapore Cable (ASC) fault. Layer 2 Ethernet services restored via the Perth to Singapore path through Jakarta remain operational, and Internet traffic continues to be managed across alternate paths where this delivers the best customer experience. Traffic originating from Perth on ASC towards Port Hedland, Christmas Island and Anyer, Indonesia remains stable and operational. …” - INDIGO West: open since 8 Aug, 50 days, per AusInternet. Operator status: Partial Service Disruption.
Latest update, 21 Sep 05:49 UTC (6 days ago): “Scheduled to repair the fault on Indigo West off the coast of Perth has completed. Unfortunately the existing shunt fault on Indigo West in Singapore has deteriorated into a full cable break and services remain down. Repairs off Singapore is expected to be on 16 Oct 2026 until 26 Oct 2026.” - Australia Singapore Cable: open since 4 Sep, 23 days, per Global Secure Layer. Operator status: Identified.
Latest update, 4 Sep 06:49 UTC (23 days ago): “We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.” - INDIGO West: notice posted by Superloop, already on its page when monitoring began 14 Sep; the notice carries no date of its own.
Notice: “We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.” - INDIGO West: works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC, per AusInternet: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
- Measured route: Perth to Oman [DIRECT_LOST] at 27 Sep 10:00 UTC — every direct path is gone: 2 path(s) were within Perth to Oman's physical floor, now none. Best path 111.2ms -> 137.8ms. 2 of 4 paths stepped with it. 2 independent vantages. The only system leaving Australia for this destination is Oman Australia Cable (OAC) (TeleGeography).
- Measured route: Perth to Oman [RECOVERY] at 27 Sep 13:00 UTC — DIRECT_LOST has cleared: two consecutive hours back to normal. 0 independent vantages. The only system leaving Australia for this destination is Oman Australia Cable (OAC) (TeleGeography).
- Measured latency (RIPE Atlas, best measured path over 24 hours against each route's best sustained floor over 37 days): Perth to Singapore 191.7ms, up 145.1ms on its 46.6ms floor; Sydney to Japan 100.4ms, up 43.0ms on its 100.5ms floor; Sydney to Singapore 144.5ms, up 48.0ms on its 96.5ms floor.
- Elsewhere: Cloudflare Radar lists no outage with a cable cut as its cause, open or ended in the last 3 days, anywhere in the world.
No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. No operator has posted an update or a new notice on these since the last brief (26 Sep 18:24 UTC). Lines marked Elsewhere are Cloudflare Radar's own outage annotations, from anywhere in the world, with the cause as Radar labels it; this archive attributes nothing to anyone. Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.
Today
The China Strategic Risks Institute (CSRI) assesses that China is developing 'gray zone' capabilities to sabotage trans-Pacific undersea cables using dual-use technologies such as the 'Striver' submersible and 'Haiyi' undersea gliders [1]. The report identifies cables connecting the U.S. to Taiwan, Japan, and the Philippines as particularly vulnerable to these discreet attacks [1]. CSRI recommends that the U.S. increase cable patrols and coordinate with allies to bolster repair fleets and redundancy to protect economic interests like AI services and high-frequency trading [1].
Gray Zone Activity and Infrastructure Resilience
Reports from ijr.com and fakti.bg indicate that Chinese research ships have been sailing close to or directly above key undersea communications cables around Taiwan [2]. Analysts assess this activity as part of an expanding "gray zone" campaign intended to exert pressure on Taiwan while avoiding large-scale military confrontation [2]. While the reports do not specify the names of the cables or vessels involved, the activity highlights a shift toward targeting critical infrastructure [2].
To counter these risks, a report from nextias.com suggests that India adopt a "redundancy, resilience, rapid repair" strategy to diversify routes and build domestic repair capacity [3]. This follows recent sabotage incidents in the Arctic and Baltic, which nextias.com notes have highlighted risks from physical damage and hybrid threats to the global digital economy [3]. Meanwhile, LD Armateurs Group has strengthened its own repair capacity by taking delivery of the TVO Mariner, an 88.3-meter DP2 multipurpose support vessel designed for subsea cable installation and repair projects [4].
Trans-Pacific Infrastructure and Security Risks
A report released on Tuesday states that three new undersea cable systems being constructed to connect the United States with Taiwan are among the most vulnerable trans-Pacific systems to Chinese gray-zone operations [6]. This security concern coincides with Meta's launch of the Petal undersea cable, a 4,300-mile system capable of 1 petabit per second transmission [5]. To support regional infrastructure, LD Armateurs has delivered the TVO Mariner, an 88.3-metre DP2 work vessel, to its subsidiary LD TravOcean for cable installation, repair, trenching, and ROV work [7].
References
- China’s Gray Zone Threats to Trans-Pacific Undersea Cables, China Strategic Risks Institute (csri.global)
Published: 22 Sep 2026 · csri.global · Claim type: analyst_assessment · Subject: analysis, policy · Systems named: Trans-Pacific cable networks · Vessels named: Striver, Haiyi · Jurisdictions: TW, JP, PH, US, CN, INT - China's Ships Map Taiwan's Undersea Cables (ijr.com)
Published: 26 Sep 2026 · ijr.com · Claim type: analyst_assessment · Subject: analysis, vessel_activity · Jurisdictions: TW, CN · Also reported by: fakti.bg - Subsea Cables: Securing the Backbone of the Digital Economy (nextias.com)
Published: 26 Sep 2026 · nextias.com · Claim type: analyst_assessment · Subject: analysis, policy · Jurisdictions: IN, INT - LD Armateurs Welcomes TVO Mariner to Strengthen Subsea Cable Operations - News and Statistics - IndexBox (indexbox.io)
Published: 26 Sep 2026 · indexbox.io · Claim type: confirmed_fact · Subject: vessel_activity, repair · Vessels named: TVO Mariner · Jurisdictions: INT - Meta Launches 4,300-Mile Petal Undersea Cable at 1 Petabit Per Second (webpronews.com)
webpronews.com - Report warns new Taiwan-US cables vulnerable to China gray-zone operations (taiwannews.com.tw)
taiwannews.com.tw - DP2 cable installation and ROV support vessel delivered to LD Armateurs (bairdmaritime.com)
Published: 25 Sep 2026 · bairdmaritime.com · Claim type: confirmed_fact · Subject: policy · Vessels named: TVO Mariner, Siddis Mariner · Jurisdictions: FR, DE
Standing status
Operator incident timelines (quoted from each operator's own status page, not summarised by any model):
- Australia Singapore Cable · Vocus — ASC repair update · first update on the page 23 Sep
25 Sep 07:45 UTCUpdate: Vocus continues to progress restoration and repair activities following the Australia Singapore Cable (ASC) fault. Layer 2 Ethernet services restored via the Perth to Singapore path through Jakarta remain operational, and Internet traffic continues to be managed across alternate paths where this delivers the best customer experience. Traffic originating from Perth on ASC towards Port Hedland, Christmas Island and Anyer, Indonesia remains stable and operational. Temporary restoration measures remain in place for affected services between Australia and Singapore. We continue to work with partners in Jakarta to manage intermittent instability associated with third-party network infrastructure. The new 100G path between Japan and Guam is in service, providing additional capacity to support Internet traffic into Asia and Europe and reducing reliance on longer alternate paths. This additional capacity further strengthens the temporary restoration arrangements in place while the permanent ASC repair progresses. Testing completed from the Perth and Singapore landing stations continues to indicate a cable break within Indonesian waters, approximately 615 km from the Singapore landing station. Restoring services remains our highest priority, and Vocus continues to work closely with our marine repair partner and relevant authorities to progress the repair program. As previously noted, Vocus agreed to sequence the repair of Indigo West ahead of ASC to provide the best overall restoration outcome for customers. Repairing ASC requires the affected section of the system to be powered down, which would temporarily remove capacity currently supporting restored services via Jakarta and place additional demand on alternate Internet paths. Restoring Indigo West first provides an additional diverse path between Australia and Asia, allowing affected customer services and Internet traffic to be rerouted before ASC is taken offline for its permanent repair. Planning for the marine repair operation continues. The repair vessel will depart Singapore on 11 October, and the Indigo West repair is expected to be completed around 24 October. The vessel is then expected to transit to the ASC repair location, with marine repair activities for ASC planned to start around 25 October. Based on the current repair schedule, completion of the ASC repair remains targeted for 4 November. Additional contingency has been incorporated into the marine program should conditions affect the planned repair activities. A key dependency of the repair remains completion of the required Indonesian operational permits and clearances. Documentation and approval activities are progressing with the relevant authorities and are part of the pre-repair program. Subsea cable repairs are complex and remain subject to a number of factors outside Vocus' direct control. The current schedule is dependent on permitting and regulatory approvals, completion of the preceding Indigo West repair, vessel movements, local sea and weather conditions, and the condition of the cable once recovered. While every effort will be made to complete the work within the planned timeframe, these dates may change if operational conditions require. Vocus will continue to closely monitor temporary restoration paths and available international capacity while the marine repair program progresses, and will provide further updates as key milestones are reached.23 Sep 08:06 UTCUpdate: Vocus continues to progress restoration and repair activities following the Australia Singapore Cable (ASC) fault. Layer 2 Ethernet services restored via the Perth to Singapore path through Jakarta remain operational, and Internet traffic continues to be managed across alternate paths where this delivers the best customer experience. Traffic originating from Perth on ASC towards Port Hedland, Christmas Island and Anyer, Indonesia is stable and operational. …
page last checked 2026-09-27 13:36 UTC · https://www.vocus.com.au/news/update-on-repairs-to-australia-singapore-cable- INDIGO West · AusInternet — network status · Partial Service Disruption, open since 8 Aug
21 Sep 05:49 UTCIdentified: Scheduled to repair the fault on Indigo West off the coast of Perth has completed. Unfortunately the existing shunt fault on Indigo West in Singapore has deteriorated into a full cable break and services remain down. Repairs off Singapore is expected to be on 16 Oct 2026 until 26 Oct 2026.
page last checked 2026-09-27 18:11 UTC · https://ausinternet.com.au/status/- Australia Singapore Cable · Global Secure Layer — network status · Identified, open since 4 Sep
4 Sep 06:49 UTCIdentified: We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.
page last checked 2026-09-27 18:11 UTC · https://status.gslnetworks.com.au/incidents/wqmz5wt7l8qj- INDIGO West · Superloop — outages · active notice, on the page when monitoring began 14 Sep 21:44 UTC (the page gives no date)
- We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.
page last checked 2026-09-27 18:11 UTC · https://www.superloop.com/outages/ - INDIGO West · AusInternet — network status · works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
page last checked 2026-09-27 18:11 UTC · https://ausinternet.com.au/status/
Also polled for changes, but carrying no incident listing, so nothing is said about their state: ACMA protection zone — Perth, ACMA protection zone — Sydney, AJC — cable system maintenance, AJC — news, SUBCO, SUBCO — INDIGO West, SUBCO — OAC, Southern Cross Cable Network, Telstra — service status, Vocus — network status.
Incident threads:
perth_indigo_2026_08(INDIGO West, INDIGO Central) — 18 documents, last 2026-09-26 (quiet 2d)
Measured path state (RIPE Atlas traceroute over 24h, no model involved):
- perth to singapore — best path 191.7ms, +145.1ms on its best sustained 46.6ms; typical path 277.0ms (+82.2ms per probe against its own history, 22 probes); ocean crossing 149.8ms; queuing 0.6ms; 37 days of history; clean crossing (22 probe(s), 64 reading(s) excluded as below the corridor's physical floor)
- sydney to japan — best path 100.4ms; typical path 178.1ms (+43.0ms per probe against its own history, 16 probes); ocean crossing 134.9ms; queuing 0.5ms; 37 days of history; clean crossing (16 probe(s))
- sydney to nz — best path 26.7ms; typical path 34.5ms (-0.1ms per probe against its own history, 8 probes); ocean crossing 27.6ms; queuing 0.2ms; steady against 37 days of history; clean crossing (8 probe(s))
- sydney to singapore — best path 144.5ms, +48.0ms on its best sustained 96.5ms; typical path 229.8ms (+47.5ms per probe against its own history, 22 probes); ocean crossing 153.1ms; queuing 0.6ms; 37 days of history; clean crossing (22 probe(s))
A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. Per-probe detail is in cablewatch segments.
Every cable route leaving the mainland (measured hourly, no model involved):
- Australia to Guam — best 70.5ms against a 52.0ms floor; 12/24 paths direct (normally 12)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S), PIPE Pacific Cable-1 (PPC-1) - Dili to Australia — best 49.4ms against a 7.1ms floor; 3 paths measured
Timor-Leste South Submarine Cable (TLSSC), North-West Cable System - Melbourne to Tasmania — best 10.1ms against a 5.9ms floor; 8/17 paths direct (normally 8)
Basslink, Bass Strait-1, Bass Strait-2 - Perth to Jakarta — best 63.3ms against a 29.5ms floor; 43 paths measured
INDIGO-West, Australia-Singapore Cable (ASC) - Perth to Oman — best 111.2ms against a 85.0ms floor; 2/4 paths direct (normally 2)
Oman Australia Cable (OAC) · only system on this route - Perth to Singapore — best 51.5ms against a 38.3ms floor; 8/67 paths direct (normally 22)
INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) - Sydney to Fiji — best 37.6ms against a 31.5ms floor; 6/6 paths direct (normally 6)
Southern Cross Cable Network (SCCN), Southern Cross NEXT - Sydney to Hawaii — best 189.1ms against a 80.0ms floor; 2 paths measured
Telstra Endeavour, Southern Cross Cable Network (SCCN), Hawaiki - Sydney to Honiara — best 38.2ms against a 28.0ms floor; 2/2 paths direct (normally 2)
Coral Sea Cable System (CS²) · only system on this route - Sydney to Japan — best 99.0ms against a 76.7ms floor; 18/94 paths direct (normally 25)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S) - Sydney to New Zealand — best 23.4ms against a 21.1ms floor; 50/65 paths direct (normally 50)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Tasman Global Access (TGA) Cable - Sydney to Noumea — best 22.3ms against a 19.3ms floor; 6/9 paths direct (normally 6)
Gondwana-1 · only system on this route - Sydney to Port Moresby — best 37.7ms against a 26.9ms floor; 3/6 paths direct (normally 3)
Coral Sea Cable System (CS²), PIPE Pacific Cable-1 (PPC-1) - Sydney to US West Coast — best 133.7ms against a 118.3ms floor; 281/302 paths direct (normally 283)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Telstra Endeavour
A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in latency_watch.yaml under uncovered.
Cloudflare Radar outages attributed to a cable cut in the last 7 days:
2026-09-23GY — NETWORK — A cut fibre-optic cable caused a significant drop in Internet traffic from One Communications (AS19863) in Guyana.
Cause is Cloudflare Radar's own classification of its own observation, reproduced as they state it. It is not this archive's finding and it attributes nothing to anyone.
Collection: 577 successful fetches in 24h, 22 errors across 6 source(s). Generated 2026-09-27 19:08 UTC.