Situation
- INDIGO West: open since 8 Aug, 45 days, per AusInternet. Operator status: Partial Service Disruption.
Latest update, 21 Sep 05:49 UTC (yesterday): “Scheduled to repair the fault on Indigo West off the coast of Perth has completed. Unfortunately the existing shunt fault on Indigo West in Singapore has deteriorated into a full cable break and services remain down. Repairs off Singapore is expected to be on 16 Oct 2026 until 26 Oct 2026.” - Australia Singapore Cable: open since 4 Sep, 18 days, per Global Secure Layer. Operator status: Identified.
Latest update, 4 Sep 06:49 UTC (18 days ago): “We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.” - INDIGO West: notice posted by Superloop, already on its page when monitoring began 14 Sep; the notice carries no date of its own.
Notice: “We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.” - INDIGO West: works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC, per AusInternet: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
- Measured latency (RIPE Atlas, best measured path over 24 hours against each route's best sustained floor over 32 days): Perth to Singapore 191.6ms, up 145.1ms on its 46.6ms floor; Sydney to Singapore 144.6ms, up 48.1ms on its 96.5ms floor.
- Elsewhere: Cloudflare Radar lists no outage with a cable cut as its cause, open or ended in the last 3 days, anywhere in the world.
No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. No operator has posted an update or a new notice on these since the last brief (21 Sep 19:37 UTC). Lines marked Elsewhere are Cloudflare Radar's own outage annotations, from anywhere in the world, with the cause as Radar labels it; this archive attributes nothing to anyone. Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.
Executive summary
- Vocus reported a major break in the Australia-Singapore Cable (ASC) in Indonesian waters on September 4 [2].
- Vocus intends to prioritize the Indigo West repair with an estimated restoration date of October 24 [2].
- The UK Ministry of Defence reported the Royal Navy successfully fired a torpedo from an uncrewed underwater vessel during AUKUS trials [3].
- SUBCO announced plans for the APX North, APX East-2, and APX West 'hypercable' systems to connect Australia, Japan, and Los Angeles [9, 12].
Today
An Amtrak construction crew accidentally severed a Verizon fiber cable in New Jersey on Monday, September 21, 2026 [1]. The resulting telecom outage disrupted thousands of flights, leading the FAA to halt incoming traffic at Newark, Teterboro, Boston, and Philadelphia airports [1]. While some lines have been repaired, Transportation Secretary Sean Duffy reported that the backup fiber break is estimated to take 13 hours to fix [1].
Suspected interference and anchor drag
Vocus reported a major break in the Australia-Singapore Cable (ASC) in Indonesian waters, approximately 615 km from the Singapore landing station, on September 4 [2]. This follows shunt faults on Subco's Indigo West and Indigo Central systems near Perth on August 8 and 9, which Subco reported to the Australian Federal Police as a potential crime [2]. Vocus intends to prioritize the Indigo West repair with an estimated restoration date of October 24, followed by the ASC on November 4 [2].
In a separate development, the UK Ministry of Defence reported that the Royal Navy successfully fired a US-Australian heavyweight torpedo from the XV Excalibur, a 12-metre uncrewed underwater vessel, during AUKUS partnership trials in British waters [3]. The Ministry of Defence described the test as a significant breakthrough for NATO's undersea advantage, specifically noting the ability to protect critical infrastructure like subsea cables and pipelines using autonomous platforms [3].
International Infrastructure Security and Technical Developments
The UK has conducted tests involving a torpedo fired from an undersea 'Excalibur' drone as a measure to protect seabed cables from Russian activity [7]. In the Middle East, U.S. airstrikes on September 1 targeted IRGC positions, which reports suggest were intended to preempt Iranian attacks on undersea communications cables in the Strait of Hormuz [8]. While CENTCOM did not confirm the specific motive, analysts assess that Iran may be pivoting toward targeting civilian digital networks as a new form of deterrence, though experts note it remains unclear if Iran has moved beyond rhetoric to active planning [8].
Technical and industrial developments also show a focus on faster fault localization and infrastructure protection. EXFO introduced the USO-1618, a co-propagation OTDR for amplified subsea cables that can locate faults in three minutes per fiber pair, a significant reduction from the six hours required by conventional testing [4]. Additionally, Intertek Metoc has joined the International Cable Protection Committee (ICPC) to provide survey management and engineering expertise to promote best practices for subsea infrastructure safety [5]. Meanwhile, Mobily is investing $905 million in a digital gateway for Saudi Arabia, integrating landing points for AAE-1, TGN-EA/SEACOM, TGN-Gulf, SEA-ME-WE 6, and Africa-1 with local data centers to support AI workloads [6].
Subsea Infrastructure Expansion and Remote Survey Operations
SUBCO has announced plans for the APX North, APX East-2, and APX West 'hypercable' systems, which represent the single largest subsea infrastructure buildout by a carrier in the Indo-Pacific [9, 12]. These systems will span over 24,000 kilometers of new seabed deployment to connect Australia, Japan, Los Angeles, and Southeast Asia, utilizing a 24 fiber-pair Spatial Division Multiplexing (SDM) architecture to support generative AI bandwidth [9, 12]. SUBCO expects to have contracts in force by early 2027, with a target Ready-for-Service (RFS) status by 2029 [9, 12].
To support growing survey demands, OMS Group opened a Remote Operations Centre in Singapore on September 22, 2026, to manage a fleet of long-range Unmanned Surface Vessels (USVs) for cable-route surveys [10]. The facility is designed to scale unmanned survey delivery while maintaining professional watchkeeping and live data review [10]. Separately, LS Marine Solution secured a $113 million contract from Hanwha Ocean for the transportation, laying, and burial of cables for a 390 MW offshore wind development in South Korea, scheduled to run until September 2028 [13].
Also noted
- Submarine Networks published the Master Investment Index: Meta’s Global Subsea Cable Infrastructure [14].
- Australia is positioning itself as a major home for artificial intelligence infrastructure, with investors reportedly planning to commit investment [15].
- Seamystics.com reports that deep sea cables are roughly as thick as a garden hose and carry the majority of digital traffic, including messages, videos, and payments [16].
References
- US flights in chaos as communications fail and cable accidentally cut (ABC News (Australia))
- Major Cable Breaks Between Perth and Singapore Reported in Indonesian Waters (charlesmok.substack.com)
Published: 22 Sep 2026 · charlesmok.substack.com · Claim type: confirmed_fact · Subject: fault, investigation, repair, analysis · Systems named: Australia-Singapore Cable, ASC, Indigo West, Indigo Central · Jurisdictions: AU, ID, SG - British robot submarine fires torpedo in a chilling warning to Russia - London Business News | Londonlovesbusiness.com (londonlovesbusiness.com)
Published: 22 Sep 2026 · londonlovesbusiness.com · Claim type: confirmed_fact · Subject: analysis, vessel_activity · Vessels named: XV Excalibur · Jurisdictions: GB, RU, AU, US, NO - EXFO Cuts Amplified Subsea Cable Fault Localization to Three Minutes per Fiber Pair (Converge Digest)
convergedigest.com - Intertek Metoc Joins ICPC To Advance Submarine Cable Safety (oceannews.com)
Published: 21 Sep 2026 · oceannews.com · Claim type: official_statement · Subject: policy · Jurisdictions: INT - Saudi Arabia’s Digital Gateway: Where Subsea Connectivity Meets Cloud and AI (Telecom Review Asia)
telecomreviewasia.com - UK tests torpedo fired from undersea 'Excalibur' drone in bid to protect seabed cables from Russia (lbc.co.uk)
lbc.co.uk - Undersea Cables: Another Front in the Iran War | Alhurra (alhurra.com)
Published: 22 Sep 2026 · alhurra.com · Claim type: analyst_assessment · Subject: analysis, policy, precedent · Jurisdictions: IRN, SAU, USA - SUBCO Unveils Three New AI Hypercables, Solidifying Its Position as Australia’s Largest Subsea Infrastructure Owner - Submarine Networks (Submarine Networks)
submarinenetworks.com - OMS Opens Singapore Remote Survey Operations Centre (Submarine Telecoms Forum)
subtelforum.com - SUBCO to build WA's largest subsea cable after AI demand surge (businessnews.com.au)
businessnews.com.au - SUBCO plans three new international subsea cables for ‘single largest’ buildout in the Indo-Pacific (capitalbrief.com)
Published: 21 Sep 2026 · capitalbrief.com · Claim type: official_statement · Subject: policy · Systems named: APX North, APX East, APX West · Jurisdictions: AU, JP, US, SG, ID - LS Marine seals record $113m offshore wind cable contract (Splash 247)
splash247.com - Master Investment Index: Meta’s Global Subsea Cable Infrastructure - Submarine Networks (Submarine Networks)
submarinenetworks.com - Australia’s Data-Centre Boom Tests the Future of AI Infrastructure (urbanacres.in)
urbanacres.in - Deep Sea Cables: The Hidden Infrastructure Beneath the Ocean - (seamystics.com)
Published: 21 Sep 2026 · seamystics.com · Claim type: analyst_assessment · Subject: analysis, policy · Systems named: 2Africa, Southern Cross · Jurisdictions: INT
Standing status
Operator incident timelines (quoted from each operator's own status page, not summarised by any model):
- INDIGO West · AusInternet — network status · Partial Service Disruption, open since 8 Aug
21 Sep 05:49 UTCIdentified: Scheduled to repair the fault on Indigo West off the coast of Perth has completed. Unfortunately the existing shunt fault on Indigo West in Singapore has deteriorated into a full cable break and services remain down. Repairs off Singapore is expected to be on 16 Oct 2026 until 26 Oct 2026.16 Sep 08:45 UTCIdentified: We would like to provide you with the latest update regarding the shunt fault in Indigo West cable system. Our submarine cable provider has informed the completion of restoration works as scheduled was completed on 15 September 03:53 UTC. They have powered up Indigo West after the final bight was released and power control was handed back to CLS. However, traffic failed to restore. …
page last checked 2026-09-22 19:10 UTC · https://ausinternet.com.au/status/- Australia Singapore Cable · Global Secure Layer — network status · Identified, open since 4 Sep
4 Sep 06:49 UTCIdentified: We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.
page last checked 2026-09-22 19:10 UTC · https://status.gslnetworks.com.au/incidents/wqmz5wt7l8qj- INDIGO West · Superloop — outages · active notice, on the page when monitoring began 14 Sep 21:44 UTC (the page gives no date)
- We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.
page last checked 2026-09-22 19:10 UTC · https://www.superloop.com/outages/ - INDIGO West · AusInternet — network status · works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
page last checked 2026-09-22 19:10 UTC · https://ausinternet.com.au/status/
1 other open incident(s) on those pages name no tracked cable system and are not shown.
Also polled for changes, but carrying no incident listing, so nothing is said about their state: ACMA protection zone — Perth, ACMA protection zone — Sydney, AJC — cable system maintenance, AJC — news, SUBCO, SUBCO — INDIGO West, SUBCO — OAC, Southern Cross Cable Network, Telstra — service status, Vocus — network status.
Incident threads:
perth_indigo_2026_08(INDIGO West, INDIGO Central) — 16 documents, last 2026-09-22 (quiet 1d)
Measured path state (RIPE Atlas traceroute over 24h, no model involved):
- perth to singapore — best path 191.6ms, +145.1ms on its best sustained 46.6ms; typical path 276.9ms (+82.3ms per probe against its own history, 22 probes); ocean crossing 149.9ms; queuing 0.7ms; 32 days of history; clean crossing (22 probe(s), 51 reading(s) excluded as below the corridor's physical floor)
- sydney to japan — best path 100.4ms; typical path 138.7ms (-0.1ms per probe against its own history, 16 probes); ocean crossing 104.9ms; queuing 0.6ms; steady against 32 days of history; clean crossing (16 probe(s))
- sydney to nz — best path 26.7ms; typical path 34.4ms (-0.1ms per probe against its own history, 8 probes); ocean crossing 28.1ms; queuing 0.2ms; steady against 32 days of history; clean crossing (8 probe(s))
- sydney to singapore — best path 144.6ms, +48.1ms on its best sustained 96.5ms; typical path 230.0ms (+47.5ms per probe against its own history, 22 probes); ocean crossing 152.1ms; queuing 0.7ms; 32 days of history; clean crossing (22 probe(s))
A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. Per-probe detail is in cablewatch segments.
Every cable route leaving the mainland (measured hourly, no model involved):
- Australia to Guam — best 70.5ms against a 52.0ms floor; 11/23 paths direct (normally 12)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S), PIPE Pacific Cable-1 (PPC-1) - Dili to Australia — best 50.4ms against a 7.1ms floor; 3 paths measured
Timor-Leste South Submarine Cable (TLSSC), North-West Cable System - Melbourne to Tasmania — best 10.2ms against a 5.9ms floor; 8/17 paths direct (normally 8)
Basslink, Bass Strait-1, Bass Strait-2 - Perth to Jakarta — best 63.2ms against a 29.5ms floor; 40 paths measured
INDIGO-West, Australia-Singapore Cable (ASC) - Perth to Oman — best 111.2ms against a 85.0ms floor; 2/4 paths direct (normally 2)
Oman Australia Cable (OAC) · only system on this route - Perth to Singapore — best 51.5ms against a 38.3ms floor; 8/67 paths direct (normally 22)
INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) - Sydney to Fiji — best 37.6ms against a 31.5ms floor; 6/6 paths direct (normally 6)
Southern Cross Cable Network (SCCN), Southern Cross NEXT - Sydney to Hawaii — best 189.1ms against a 80.0ms floor; 2 paths measured
Telstra Endeavour, Southern Cross Cable Network (SCCN), Hawaiki - Sydney to Honiara — best 38.2ms against a 28.0ms floor; 2/2 paths direct (normally 2)
Coral Sea Cable System (CS²) · only system on this route - Sydney to Japan — best 99.0ms against a 76.7ms floor; 23/94 paths direct (normally 25)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S) - Sydney to New Zealand — best 23.4ms against a 21.1ms floor; 50/65 paths direct (normally 50)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Tasman Global Access (TGA) Cable - Sydney to Noumea — best 22.4ms against a 19.3ms floor; 6/9 paths direct (normally 6)
Gondwana-1 · only system on this route - Sydney to Port Moresby — best 37.8ms against a 26.9ms floor; 3/6 paths direct (normally 3)
Coral Sea Cable System (CS²), PIPE Pacific Cable-1 (PPC-1) - Sydney to US West Coast — best 133.7ms against a 118.3ms floor; 282/302 paths direct (normally 283)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Telstra Endeavour
A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in latency_watch.yaml under uncovered.
Collection: 597 successful fetches in 24h, 36 errors across 9 source(s). Generated 2026-09-22 19:45 UTC.