Vocus Sets November 4 Completion Date for Australia Singapore Cable Repairs 2026-09-21 This is Cable Watch for 21 September 2026. Vocus Sets November 4 Completion Date for Australia Singapore Cable Repairs. Situation. INDIGO West, open 44 days: AusInternet posted an update on 21 September. Scheduled to repair the fault on Indigo West off the coast of Perth has completed. Unfortunately the existing shunt fault on Indigo West in Singapore has deteriorated into a full cable break and services remain down. Repairs off Singapore is expected to be on 16 Oct 2026 until 26 Oct 2026. Today. Vocus expects to complete permanent repairs to the Australia Singapore Cable (ASC) by 4 November. This follows the scheduled restoration of the Indigo West subsea cable on 24 October, which serves as a primary route between Australia and Singapore. While the ASC fault continues to affect services, Vocus stated that Layer 2 Ethernet services via the Perth-Singapore route through Jakarta remain operational. International Infrastructure Developments. The ACE Cable consortium selected Ciena to upgrade the Africa Coast to Europe (ACE) system to over 30 Tb/s using WaveLogic 6 Extreme coherent optics. Meanwhile, Meta and its partners announced Petal, a petabit-class transoceanic cable between France and the United States, which is expected to enter service in 2029 using multi-core fiber technology. In the South Atlantic, Fugro clarified that its vessel, Fugro Supporter, conducted a seabed survey off Argentina for a project contracted by SubCom, rather than the UK government. Canalink completed the marine deployment of the Atlántica cable project in the Canary Islands, with the vessel Teliri installing 553 kilometers of cable to connect Gran Canaria, Fuerteventura, and Lanzarote. To support growing installation demands, Jan De Nul ordered a second subsea trenching vessel capable of burying cables up to five metres deep. Capacity Upgrades and Infrastructure Interdependencies. FLAG announced on 21 September 2026 that it is deploying Ciena WaveLogic 6 Extreme technology on its dedicated fiber pair within the ECHO submarine cable system. The upgrade covers more than 16,000 kilometers of the trans-Pacific route connecting Singapore, Guam, and California, and is intended to support new 400GbE and 800GbE services for hyperscalers and cloud providers. Additionally, the Submarine Telecoms Forum released Issue 150, which includes expert assessments on the intersection of offshore energy and submarine networks. The publication highlights how fiber networks support oil, gas, and wind operations, while also addressing AI capacity, South Pacific resilience, and the SAEx East cable system. Also noted. A ship off Sicily reportedly dragged its anchor for 300 kilometres and sliced through six submarine cables, an event that went unnoticed by anyone onshore. That has been Cable Watch for 21 September 2026. Sourcing, claim types and the standing status of every tracked system are in the written brief.