Situation
- INDIGO West: open since 8 Aug, 40 days, per AusInternet. Operator status: Partial Service Disruption.
Latest update, 16 Sep 08:45 UTC (yesterday): “We would like to provide you with the latest update regarding the shunt fault in Indigo West cable system. Our submarine cable provider has informed the completion of restoration works as scheduled was completed on 15 September 03:53 UTC. They have powered up Indigo West after the final bight was released and power control was handed back to CLS. However, traffic failed to restore. …” - Australia Singapore Cable: open since 4 Sep, 13 days, per Global Secure Layer. Operator status: Identified.
Latest update, 4 Sep 06:49 UTC (13 days ago): “We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.” - INDIGO West: notice posted by Superloop, already on its page when monitoring began 14 Sep; the notice carries no date of its own.
Notice: “We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.” - INDIGO West: works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC, per AusInternet: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
- Measured route: Perth to Jakarta [GROUP_STEP] at 17 Sep 04:00 UTC — 31 of 41 paths stepped, median +63.6ms against each path's own floor. 3 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC) (TeleGeography). The measurement cannot say which one moved.
- Measured route: Perth to Singapore [DIRECT_LOST] at 17 Sep 04:00 UTC — direct paths down to 7 of the 22 this route normally holds. Best path 45.9ms -> 53.1ms. 43 of 63 paths stepped with it. 3 independent vantages. Systems serving this route: INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) (TeleGeography). The measurement cannot say which one moved.
- Measured latency (RIPE Atlas, best measured path over 24 hours against each route's best sustained floor over 27 days): Perth to Singapore 187.5ms, up 141.0ms on its 46.6ms floor; Sydney to Japan 100.4ms, up 42.9ms on its 100.5ms floor; Sydney to Singapore 144.5ms, up 48.1ms on its 96.5ms floor.
No model writes this section. Operator updates are quoted from each operator's own status page and dated as the operator dated them. No operator has posted an update or a new notice on these since the last brief (16 Sep 22:44 UTC). Latency is measured between cities, not on any named cable: several systems serve each route and traffic moves to a survivor within seconds of a fault. Detail is in Standing status at the end of the brief.
Executive summary
- XLSmart has commenced construction on the Candle cable system connecting Indonesia, Singapore, Malaysia, the Philippines, Taiwan, and Japan [1].
- Streamlinefeed reports that 99 percent of intercontinental internet traffic relies on 550 cables increasingly vulnerable to sabotage in the South China Sea [3].
- Dr Shahridan Faiez of Citizens International warns that cables in the Strait of Malacca transmit US$10 trillion in daily transactions [7].
- TeleGeography reports that IP transit prices for 100 GigE are projected to fall 17% compounded annually through Q2 2026 [5].
Today
XLSmart has commenced construction on the Candle cable system, an 8,000-kilometer network connecting Indonesia, Singapore, Malaysia, the Philippines, Taiwan, and Japan [1]. The consortium, which includes Meta, Globe Telecom, Telekom Malaysia, SoftBank, and IPS Inc., plans to land the system at Tanjung Bemban on Batam [1]. XLSmart Director Andrijanto Muljono characterized the project as a strategic investment to meet Indonesia's long-term connectivity needs [1].
Regional Cable Damage and Infrastructure Vulnerability
A historical log of undersea cable damage since 2023 identifies multiple incidents in the Australia and Indo-Pacific regions, specifically noting faults on the Indigo West and Indigo Central systems in August 2026 [2]. Other regional damage includes the TPKM-2 and TPKM-3 (Taiwan, Feb 2023), Trans-Pacific Express (Taiwan, Jan 2025), Taiwan, Penghu No. 3 (Taiwan, Feb 2025), and Taiwan, Matsu No. 3 (Taiwan, Mar/Apr 2026), with the latter scheduled for repair in late July 2026 [2].
Streamlinefeed reports that 99 percent of intercontinental internet traffic relies on approximately 550 subsea fiber-optic cables, which are increasingly vulnerable to sabotage in the South China Sea and other high-risk regions [3]. The report notes a critical deficit in specialized repair ships, stating that over 40 percent of the global fleet is more than 25 years old, which may exacerbate delays following infrastructure damage [3].
Geopolitical Significance of Subsea Infrastructure
The Grand Review reports that undersea fiber optic cables carry over 99% of international internet traffic and are projected to reach a market value of $30 billion by 2028 [4]. The outlet notes that these cables are increasingly viewed as critical national assets and geopolitical battlegrounds as nations prioritize digital sovereignty and protection against sabotage or accidental damage [4]. For Pakistan, the report states that expanding this infrastructure is considered a vital pathway for national security and economic diversification [4].
Regional Infrastructure Resilience and Market Trends
TeleGeography reports that IP transit prices for 100 GigE are projected to fall 17% compounded annually from Q2 2023 to Q2 2026, potentially bottoming out at $0.03 per Mbps in competitive markets [5]. This price erosion is attributed to new subsea cable systems and increased content localization, even as 400 GigE sales grow to meet hyperscaler and AI-related demand [5].
In the Strait of Malacca, Citizens International chairman Dr Shahridan Faiez warned that submarine cables in the waterway transmit US$10 trillion in daily financial transactions, creating a critical vulnerability for regional banks and essential services [7]. Dr Faiez noted that alternative routes like the Lombok and Makassar straits are not realistic backups due to low traffic and lack of infrastructure, and highlighted that only about 20 of the 60 specialized cable repair ships worldwide are operational at any time [7]. Meanwhile, strategic adviser Sim Chiun Wee argues that Malaysia should shift its focus toward testing how economic chains, such as banking and manufacturing, survive infrastructure failures rather than just increasing the quantity of physical assets [6].
References
- XLSmart Begins Candle Cable Construction (Submarine Telecoms Forum)
subtelforum.com · Also reported by: Telecom Review Asia - Undersea Cable Damage Log: Baltic Sea, Taiwan, Red Sea and Australia Incidents Since 2023 | Referently.com (referently.com)
Published: 15 Sep 2026 · referently.com · Claim type: confirmed_fact · Subject: fault, investigation, vessel_activity, precedent · Systems named: TPKM-2, TPKM-3, Balticconnector, AAE-1, Seacom, EIG (+4 more) · Vessels named: NewNew Polar Bear, Rubymar, Yi Peng 3, Eagle S, Shunxing-39, Vezhen (+3 more) · Jurisdictions: TW, FI, EE, SE, DE, DK (+2 more) - Streamlinefeed (streamlinefeed.co.ke)
Published: 14 Sep 2026 · streamlinefeed.co.ke · Claim type: analyst_assessment · Subject: analysis, policy · Systems named: Dunant, Amitie, SEACOM, 2Africa, EASSy · Jurisdictions: INT - Undersea Cables: The Invisible Infrastructure That Quietly... | The Grand Review (grand-review.com)
Published: 16 Sep 2026 · grand-review.com · Claim type: analyst_assessment · Subject: analysis, policy · Jurisdictions: INT - IP Transit Pricing in 2026: More Competition, More Price Erosion (TeleGeography blog)
Published: 16 Sep 2026 · resources.telegeography.com · Claim type: analyst_assessment · Subject: analysis · Jurisdictions: INT, SG - Opinion: The next infrastructure failure may leave no wreckage (klsescreener.com)
klsescreener.com - Malacca Strait Cable Disruption Could Cripple Key Services Across The Region (bernama.com)
bernama.com
Standing status
Operator incident timelines (quoted from each operator's own status page, not summarised by any model):
- INDIGO West · AusInternet — network status · Partial Service Disruption, open since 8 Aug
16 Sep 08:45 UTCIdentified: We would like to provide you with the latest update regarding the shunt fault in Indigo West cable system. Our submarine cable provider has informed the completion of restoration works as scheduled was completed on 15 September 03:53 UTC. They have powered up Indigo West after the final bight was released and power control was handed back to CLS. However, traffic failed to restore. …
page last checked 2026-09-17 19:07 UTC · https://ausinternet.com.au/status/- Australia Singapore Cable · Global Secure Layer — network status · Identified, open since 4 Sep
4 Sep 06:49 UTCIdentified: We observed short flaps occurring on the ASC submarine cable system at 04/09/2026 03:50:33 UTC. However a hard down event followed at 04/09/2026 06:19:12 UTC Due to the Indigo West cable system also being offline for shunt fault repairs, traffic will take a longer path which will result in higher latency between Australia and Singapore. We are waiting for further information from Vocus regarding this outage. Information received will be shared via our status page.
page last checked 2026-09-17 19:08 UTC · https://status.gslnetworks.com.au/incidents/wqmz5wt7l8qj- INDIGO West · Superloop — outages · active notice, on the page when monitoring began 14 Sep 21:44 UTC (the page gives no date)
- We are currently experiencing a service disruption affecting the Indigo West link due to instability. Our team is actively investigating and working to resolve the issue. Updates will be provided as more information becomes available. Support remains available via phone and email during this time.
page last checked 2026-09-17 19:08 UTC · https://www.superloop.com/outages/ - INDIGO West · AusInternet — network status · works scheduled 2 Oct 00:00 UTC to 8 Oct 23:00 UTC: “Indigo West (Perth-Singapore) Shunt Fault Repairs (Singapore)”
page last checked 2026-09-17 19:07 UTC · https://ausinternet.com.au/status/
Also polled for changes, but carrying no incident listing, so nothing is said about their state: SUBCO, SUBCO — INDIGO West, Telstra — service status, Vocus — network status.
Incident threads:
perth_indigo_2026_08(INDIGO West, INDIGO Central) — 15 documents, last 2026-09-15 (quiet 3d)
Measured path state (RIPE Atlas traceroute over 24h, no model involved):
- perth to singapore — best path 187.5ms, +141.0ms on its best sustained 46.6ms; typical path 274.1ms (+72.8ms per probe against its own history, 21 probes); ocean crossing 150.0ms; queuing 0.7ms; 27 days of history; clean crossing (21 probe(s), 35 reading(s) excluded as below the corridor's physical floor)
- sydney to japan — best path 100.4ms; typical path 177.8ms (+42.9ms per probe against its own history, 17 probes); ocean crossing 133.2ms; queuing 0.5ms; 27 days of history; clean crossing (17 probe(s))
- sydney to nz — best path 26.8ms; typical path 34.4ms (-0.1ms per probe against its own history, 8 probes); ocean crossing 28.1ms; queuing 0.2ms; steady against 27 days of history; clean crossing (8 probe(s))
- sydney to singapore — best path 144.5ms, +48.1ms on its best sustained 96.5ms; typical path 225.7ms (+28.1ms per probe against its own history, 21 probes); ocean crossing 153.9ms; queuing 0.7ms; 27 days of history; clean crossing (21 probe(s))
A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. Per-probe detail is in cablewatch segments.
Every cable route leaving the mainland (measured hourly, no model involved):
- Australia to Guam — best 70.6ms against a 52.0ms floor; 10/24 paths direct (normally 8)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S), PIPE Pacific Cable-1 (PPC-1) - Dili to Australia — best 49.0ms against a 7.1ms floor; 3 paths measured
Timor-Leste South Submarine Cable (TLSSC), North-West Cable System - Melbourne to Tasmania — best 10.1ms against a 5.9ms floor; 8/17 paths direct (normally 6)
Basslink, Bass Strait-1, Bass Strait-2 - Perth to Jakarta — best 70.3ms against a 29.5ms floor; 43 paths measured
INDIGO-West, Australia-Singapore Cable (ASC) - Perth to Oman — best 143.1ms against a 85.0ms floor; 0/4 paths direct (normally 2)
Oman Australia Cable (OAC) · only system on this route - Perth to Singapore — best 57.9ms against a 38.3ms floor; 7/64 paths direct (normally 22)
INDIGO-West, Australia-Singapore Cable (ASC), Darwin-Jakarta-Singapore Cable (DJSC) - Sydney to Fiji — best 37.7ms against a 31.5ms floor; 6/6 paths direct (normally 6)
Southern Cross Cable Network (SCCN), Southern Cross NEXT - Sydney to Hawaii — best 189.2ms against a 80.0ms floor; 2 paths measured
Telstra Endeavour, Southern Cross Cable Network (SCCN), Hawaiki - Sydney to Honiara — best 38.3ms against a 28.0ms floor; 2/2 paths direct (normally 2)
Coral Sea Cable System (CS²) · only system on this route - Sydney to Japan — best 99.0ms against a 76.7ms floor; 21/100 paths direct (normally 25)
Australia-Japan Cable (AJC), Japan-Guam-Australia South (JGA-S) - Sydney to New Zealand — best 23.4ms against a 21.1ms floor; 50/65 paths direct (normally 50)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Tasman Global Access (TGA) Cable - Sydney to Noumea — best 22.3ms against a 19.3ms floor; 7/9 paths direct (normally 6)
Gondwana-1 · only system on this route - Sydney to Port Moresby — best 37.6ms against a 26.9ms floor; 3/6 paths direct (normally 3)
Coral Sea Cable System (CS²), PIPE Pacific Cable-1 (PPC-1) - Sydney to US West Coast — best 133.6ms against a 118.3ms floor; 266/302 paths direct (normally 283)
Southern Cross Cable Network (SCCN), Southern Cross NEXT, Hawaiki, Telstra Endeavour
A route is a pair of places, not a cable: several systems serve most of these and IP routing does not reveal which one carried a packet, so a healthy route is not evidence that every cable on it is intact. A path counts as direct when it is within reach of the physical floor between the two places. Routes with no vantage at the far end are listed in latency_watch.yaml under uncovered.
Collection: 549 successful fetches in 24h, 50 errors across 10 source(s). Generated 2026-09-17 19:36 UTC.