← Cable Watch

9 September 2026 · Issue 47

Philippines Warns of Growing Sabotage Risks to Subsea Infrastructure

Philippine officials highlighted threats to the domestic submarine cable network and Malampaya pipeline during a security forum. The Department of Justice is moving to establish a dedicated maritime legal unit to address infrastructure protection.

Markdown · Subscribe

Executive summary

Philippine officials warned of increasing risks to the 2,500-kilometer Philippine Domestic Submarine Cable Network and the 504-kilometer Malampaya deepwater pipeline, citing gray-zone tactics, cyberattacks, and physical sabotage [1]. In response, the Department of Justice is working to institutionalize a Maritime Advisory and Legal Action Unit to address legal gaps regarding infrastructure attacks within the country's exclusive economic zone [1].

Unmanned Underwater Vehicle Seizure in Strait of Hormuz

The Islamic Revolutionary Guard Corps (IRGC) claimed to have captured a U.S. Dive-LD unmanned underwater vehicle near the Strait of Hormuz [2]. While the U.S. has not officially confirmed the seizure, defense officials stated the commercially available Anduril drone stopped working and may have drifted into Iranian waters [2]. The IRGC also reported shooting down a U.S. MQ-9 Reaper drone in the same region [2].

New Submarine Cable Projects in East Africa and the Americas

The LuLu Cable System, a 500km submarine cable route along Kenya's Indian Ocean shoreline, was announced by INDOI Ltd. (IOX) and several partners [3]. The system will connect Mombasa, Vipingo Special Economic Zone, Kilifi, Malindi, and Lamu using a dual-path architecture with 144 fibre pairs and a design capacity of up to 60 Tbps per fibre pair, with a target readiness for service in Q2 2028 [3].

In the Americas, Telxius has completed a new infrastructure complex in Cancún, Mexico, to host the Tikal submarine system [4]. Connecting Puerto Barrios, Guatemala, to Boca Raton, Florida, the system is expected to begin operations in the first half of 2027 and will provide an initial capacity of 380 terabits per second [4].

References

  1. PH warns of growing threats to critical undersea infrastructure (gmanetwork.com)
    gmanetwork.com
  2. Iran Says It Captured U.S. Military’s Most Modern Unmanned Submarine In Strait Of Hormuz (Marine Insight)
    marineinsight.com
  3. LuLu Cable System Launches on Kenya’s Coast (Submarine Telecoms Forum)
    subtelforum.com
  4. Cancún bets on artificial intelligence with new high-capacity digital infrastructure (mx.ibtimes.com)
    Published: 08 Sep 2026 · mx.ibtimes.com · Claim type: official_statement · Subject: policy · Systems named: Tikal, SAm-1, PCCS · Jurisdictions: MX, GT, US

Standing status

Operator-reported state (read directly from each operator's own status page, not summarised by any model):

Cable systems shown are those named anywhere on the captured page, matched against the systems tracked in geofences.yaml. A named system is not by itself a claim that it is the affected one.

Changes in the last 7 days:

Incident threads:

Measured path state (RIPE Atlas traceroute, median across probes over 24h, no model involved):

A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. Per-probe detail is in cablewatch segments.

Vessel review queue:

Review priority is a heuristic score from this repo ordering which tracks a human should look at. It is not evidence, and it implies nothing about any vessel.

Collection: 957 successful fetches in 24h, 31 errors across 8 source(s). Generated 2026-09-09 19:30 UTC.