---
date: 2026-09-06
issue: 44
title: Firmus Secures 150 Tbps Capacity on SUBCO's APX East Cable
standfirst: Australian AI provider Firmus signed a 25-year, US$300 million agreement
  to secure dedicated capacity on the Asia Pacific Express East system. The deal aims
  to facilitate the export of AI processing outputs from Australia to U.S. hyperscalers.
jurisdictions:
- AU
- US
- INT
- FR
- ZA
- IE
tags: []
vertical: cablewatch
---

## Executive summary

- Firmus has committed US$300 million to secure up to 150 Tbps of dedicated capacity on the APX East cable system, which connects Sydney to the U.S. West Coast and is scheduled for service in Q4 2028 [1].
- Toptana Technologies has begun construction on a new Cable Landing Station in Ocean Shores, Washington, to serve as the primary U.S. landing point for the Sta'O'Nuk transpacific cable system [2].
- The ReuNION subsea cable project, a 320 Tbps system linking La Réunion to South Africa by 2028, was unveiled by Orange and a consortium including Telco OI (Free) and Réunicable [3].
- Ireland's national planning appeals board upheld permission for Amazon Web Services (AWS) to build a landing station in County Cork for the Fastnet cable, a privately owned transatlantic system connecting Maryland to Ireland [4].

Firmus has committed US$300 million to secure up to 150 Tbps of dedicated capacity on the APX East cable system, which connects Sydney to the U.S. West Coast [1]. The ~13,000 km system is engineered as the world's longest continuous optical subsea route without intermediate landings, with a target ready-for-service date of Q4 2028 [1].

## International Infrastructure Developments

Toptana Technologies has broken ground on a new Cable Landing Station in Ocean Shores, Washington, to serve as the primary U.S. landing point for the Sta'O'Nuk transpacific cable system [2]. The 420 Tbps system includes a 300+ mile terrestrial backhaul to Seattle and Hillsboro, creating a route that bypasses traditional West Coast telecommunications chokepoints [2]. 

In Europe and Africa, Orange and a consortium including Telco OI (Free) and Réunicable unveiled the ReuNION subsea cable project, which will link La Réunion to South Africa with a 320 Tbps design capacity by 2028 [3]. This project replaces the aging SAFE cable and is supported by European Union funding to secure digital sovereignty for La Réunion [3]. Separately, Ireland's national planning appeals board upheld permission for Amazon Web Services (AWS) to build a landing station in County Cork for the Fastnet cable [4]. Fastnet is AWS's first 100% privately owned transatlantic cable, connecting Maryland to Ireland with over 320 Tbps of bandwidth for cloud and AI workloads [4].

## References

1. [Firmus Commits US$300M to SUBCO's APX East Cable in Anchor Trans-Pacific AI Agreement - Submarine Networks](https://www.submarinenetworks.com/en/systems/trans-pacific/apx-east/firmus-commits-usd300m-to-subco-apx-east-cable) (Submarine Networks)
   submarinenetworks.com
2. [Toptana Builds Washington CLS to House AWS' Sta'O'Nuk Transpacific Cable - Submarine Networks](https://www.submarinenetworks.com/en/systems/trans-pacific/staonuk/toptana-builds-washington-cls-to-house-aws-sta-o-nuk-transpacific-cable) (Submarine Networks)
   submarinenetworks.com
3. [Orange Builds ReuNION Subsea Cable Linking La Réunion to South Africa - Submarine Networks](https://www.submarinenetworks.com/en/systems/asia-europe-africa/reunion/orange-builds-reunion-subsea-cable-linking-la-r%C3%A9union-to-south-africa) (Submarine Networks)
   submarinenetworks.com
4. [AWS Wins Final Planning Approval for Fastnet Cable Landing Station in West Cork - Submarine Networks](https://www.submarinenetworks.com/en/systems/trans-atlantic/fastnet/aws-wins-final-planning-approval-for-fastnet-cable-landing-station-in-west-cork) (Submarine Networks)
   submarinenetworks.com

---

## Standing status

**Operator-reported state** (read directly from each operator's own status page, not summarised by any model):

- **AusInternet — network status** — **INDIGO Central, INDIGO West**  
  Status: partial service disruption; Fault: shunt fault; Fault location: 65km from Perth Cable Landing Station; Repair ETA: 26 Aug 2026 / 30 Aug 2026 with an ETR on 4 Sep 2026; Delayed until: August 25th / 2nd of October NBN POI 2PTH (Penrith; Repair vessel: repairing the Shunt Fault off Perth betwee; Planned maintenance: Data Centres / NBN POI 3FSR (Footscray), 3DAD (Dandenong), 3KAL (Karingal), 3STK (St  
  <sub>as at 2026-09-06 16:13 UTC · https://ausinternet.com.au/status/</sub>
- **Global Secure Layer — network status** — **INDIGO West**  
  Status: partial outage; Fault: shunt fault  
  <sub>as at 2026-09-06 16:14 UTC · https://status.gslnetworks.com.au</sub>
- **SUBCO — INDIGO West** — **INDIGO West**  
  <sub>as at 2026-08-19 04:36 UTC · https://sub.co/indigo-west/</sub>
- **SUBCO** — **Oman Australia Cable, INDIGO Central, INDIGO West, SMAP**  
  Status: monitoring  
  <sub>as at 2026-09-06 17:13 UTC · https://sub.co</sub>
- **Telstra — service status**  
  Status: monitoring  
  <sub>as at 2026-09-02 01:36 UTC · https://www.telstra.com.au/exchange</sub>
- **Vocus — network status**  
  Status: operational; Affected system: drum  
  <sub>as at 2026-08-31 01:33 UTC · https://www.vocus.com.au</sub>

<sub>Cable systems shown are those named anywhere on the captured page, matched against the systems tracked in `geofences.yaml`. A named system is not by itself a claim that it is the affected one.</sub>

**Changes in the last 7 days:**

- `2026-09-06 16:13` AusInternet — network status — Planned maintenance: NBN POI 2MYF (Mayfield) - Permanent cable repair Planned Maintenance → **Data Centres**
- `2026-09-06 16:13` AusInternet — network status — Planned maintenance: September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9 → **NBN POI 3FSR (Footscray), 3DAD (Dandenong), 3KAL (Karingal), 3STK (St**
- `2026-09-06 16:13` AusInternet — network status — Planned maintenance: September 7, 2026 11:00PM - 6:00AM AEST September 7, 2026 1:00PM - 8 → **September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9**
- `2026-09-06 16:13` AusInternet — network status — Planned maintenance: September 8, 2026 12:00AM - 2:00AM AEST September 7, 2026 2:00PM - 4 → **September 7, 2026 11:00PM - 6:00AM AEST September 7, 2026 1:00PM - 8**
- `2026-09-06 16:13` AusInternet — network status — Planned maintenance: September 9, 2026 12:00AM - 2:00AM AEST September 8, 2026 2:00PM - 4 → **September 8, 2026 12:00AM - 2:00AM AEST September 7, 2026 2:00PM - 4**
- `2026-09-03 03:13` AusInternet — network status — Delayed until: 2nd of October → **2nd of October NBN POI 2PTH (Penrith**
- `2026-09-01 20:11` AusInternet — network status — Planned maintenance: Data Centres → **NBN POI 2MYF (Mayfield) - Permanent cable repair Planned Maintenance**
- `2026-09-01 20:11` AusInternet — network status — Planned maintenance: NBN POI 2MYF (Mayfield) - Permanent cable repair Planned Maintenance → **September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9**
- `2026-09-01 20:11` AusInternet — network status — Planned maintenance: September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9 → **September 7, 2026 11:00PM - 6:00AM AEST September 7, 2026 1:00PM - 8**
- `2026-09-01 20:11` AusInternet — network status — Planned maintenance: September 7, 2026 11:00PM - 6:00AM AEST September 7, 2026 1:00PM - 8 → **September 8, 2026 12:00AM - 2:00AM AEST September 7, 2026 2:00PM - 4**
- `2026-09-01 20:11` AusInternet — network status — Planned maintenance: September 8, 2026 12:00AM - 2:00AM AEST September 7, 2026 2:00PM - 4 → **September 9, 2026 12:00AM - 2:00AM AEST September 8, 2026 2:00PM - 4**
- `2026-09-01 13:12` AusInternet — network status — Planned maintenance: NBN POI 2CAM (Campsie), 2PTH (Penrith), 2GBE (Glebe), 2MIR (Miranda → **Data Centres**
- `2026-09-01 13:12` AusInternet — network status — Planned maintenance: September 1, 2026 11:00PM - 6:00AM AEST September 1, 2026 1:00PM - 8 → **NBN POI 2MYF (Mayfield) - Permanent cable repair Planned Maintenance**
- `2026-09-01 13:12` AusInternet — network status — Planned maintenance: September 7, 2026 12:00AM - 7:00AM AEST September 6, 2026 2:00PM - 9 → **September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9**
- `2026-09-01 13:12` AusInternet — network status — Planned maintenance: September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9 → **September 7, 2026 11:00PM - 6:00AM AEST September 7, 2026 1:00PM - 8**
- `2026-09-01 13:12` AusInternet — network status — Planned maintenance: September 7, 2026 11:00PM - 6:00AM AEST September 7, 2026 1:00PM - 8 → **September 8, 2026 12:00AM - 2:00AM AEST September 7, 2026 2:00PM - 4**
- `2026-09-01 01:14` AusInternet — network status — Planned maintenance: September 3, 2026 11:00PM - 6:00AM AEST September 3, 2026 1:00PM - 8 → **September 7, 2026 12:00AM - 7:00AM AEST September 6, 2026 2:00PM - 9**
- `2026-09-01 01:14` AusInternet — network status — Planned maintenance: September 7, 2026 12:00AM - 7:00AM AEST September 6, 2026 2:00PM - 9 → **September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9**
- `2026-09-01 01:14` AusInternet — network status — Planned maintenance: September 7, 2026 10:00PM - 7:00AM AEST September 7, 2026 12:00PM - 9 → **September 7, 2026 11:00PM - 6:00AM AEST September 7, 2026 1:00PM - 8**
- `2026-08-31 20:13` AusInternet — network status — Planned maintenance: Data Centres → **NBN POI 2CAM (Campsie), 2PTH (Penrith), 2GBE (Glebe), 2MIR (Miranda**

**Incident threads:**

- `other` — 56 documents, last 2026-09-01 (quiet 6d)
- `perth_indigo_2026_08` (INDIGO West, INDIGO Central) — 10 documents, last 2026-08-27 (quiet 11d)

**Measured path state** (RIPE Atlas traceroute, median across probes over 24h, no model involved):

- **perth to singapore** — ocean crossing 177.1ms; queuing 0.6ms; end to end floor **273.6ms, +73.8ms against its 17 day baseline**; clean crossing (21 probe(s), 64 reading(s) excluded as below the corridor's physical floor)
- **sydney to japan** — ocean crossing 133.7ms; queuing 0.5ms; end to end floor **182.4ms, +41.1ms against its 17 day baseline**; clean crossing (17 probe(s))
- **sydney to nz** — ocean crossing 27.5ms; queuing 0.2ms; end to end floor 34.4ms, steady against its 17 day baseline; clean crossing (8 probe(s))
- **sydney to singapore** — ocean crossing 187.5ms; queuing 0.6ms; end to end floor **240.8ms, +41.3ms against its 17 day baseline**; clean crossing (22 probe(s))

<sub>A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. Per-probe detail is in `cablewatch segments`.</sub>

**Vessel review queue:**

- `perth_cpz_2026_08` (INDIGO West, INDIGO Central) — 1 candidate(s), top review priority 0.33

<sub>Review priority is a heuristic score from this repo ordering which tracks a human should look at. It is not evidence, and it implies nothing about any vessel.</sub>

<sub>Collection: 364 successful fetches in 24h, 135 errors across 28 source(s). Generated 2026-09-06 18:58 UTC.</sub>
