← Cable Watch

3 September 2026 · Issue 41

AWS Announces Sta’O’Nuk Subsea Cable to Connect US and Japan

The new transpacific system aims to provide 420 Tbps of capacity by 2029. It will establish a new landing route in Washington state, the first international subsea cable to land there in nearly 30 years.

Markdown · Subscribe

Executive summary

Amazon Web Services (AWS) has announced plans for Sta’O’Nuk, a new subsea cable system providing 420 Tbps of capacity between the United States and Japan [1]. The project, scheduled for completion by 2029, will feature 20 fiber pairs and utilize a new landing route in Washington state developed in partnership with Toptana Technologies and Assured Communications [1]. This route is intended to provide geographic diversity from existing California and Oregon corridors, reducing exposure to regional risks while supporting high-bandwidth workloads [1].

International Submarine Cable Projects

Orange has joined a consortium including Telco OI, Réunicable, and La Réunion Connectée to develop the ReuNION submarine cable project, which will connect La Réunion to South Africa [2]. Orange will act as the landing party for the project, with Orange Marine handling deployment and Alcatel Submarine Networks managing design and manufacturing [2]. The system will feature 16 fiber pairs capable of 20 terabits per second each and is supported by European funding from the Connecting Europe Facility and the European Regional Development Fund [2].

Telecom Egypt has signed an agreement with Power Sub Link to construct a 200-kilometer submarine cable between Sharm El Sheikh and Taba [3]. This project extends the Red Sea Subsea Festoon Cable System northward to create a continuous coastal chain from Suez to Taba [3]. Telecom Egypt claims the link will have a design capacity of approximately five petabits per second and aims for a ready-for-service status in the fourth quarter of 2027 [3].

Investment and Policy Developments

The Australian Government has launched the Cable Connectivity and Resilience Centre, a whole-of-government initiative within the Department of Foreign Affairs and Trade [5]. The government will invest over $18 million over four years to provide research and technical assistance to strengthen Indo-Pacific undersea networks as part of the Quad Partnership for Cable Connectivity and Resilience [5].

In the private sector, Firmus is investing USD 300 million in Subco’s APX East system, which links Australia and the United States [4]. Firmus will secure up to 150 terabits per second of dedicated capacity over 25 years, with the system expected to be ready for service in Q4 2028 [4]. Additionally, Toptana Technologies began construction on a new submarine cable landing station at Ocean Shores, Washington, on September 2, 2026, to support up to four systems including the AWS-owned Sta’O’Nuk system [6].

References

  1. AWS Plans 420 Tbps Sta’O’Nuk Subsea Cable Between US and Japan (Converge Digest)
    convergedigest.com · Also reported by: Submarine Telecoms Forum
  2. Orange Announces ReuNION Submarine Cable Project Connecting La Réunion to South Africa (thefastmode.com)
    thefastmode.com · Also reported by: Submarine Telecoms Forum
  3. Telecom Egypt Signs Sharm El Sheikh, Taba Cable Deal (Submarine Telecoms Forum)
    subtelforum.com
  4. Firmus invests USD300m in Subco’s trans-Pacific cable APX East (capitalbrief.com)
    capitalbrief.com
  5. News | Cable Connectivity & Resilience Centre (Cable Connectivity & Resilience Centre, news and media)
    ccrc.gov.au
  6. Toptana Begins Washington Cable Landing Station Build (Submarine Telecoms Forum)
    subtelforum.com

Standing status

Operator-reported state (read directly from each operator's own status page, not summarised by any model):

Cable systems shown are those named anywhere on the captured page, matched against the systems tracked in geofences.yaml. A named system is not by itself a claim that it is the affected one.

Changes in the last 7 days:

Incident threads:

Measured path state (RIPE Atlas traceroute, median across probes over 24h, no model involved):

A corridor is a city pair, not a cable. Several systems serve each of these routes and IP routing does not reveal which one carries a packet, so a healthy corridor is not evidence that any particular cable is intact: traffic reroutes onto a survivor within seconds of a fault. Per-probe detail is in cablewatch segments.

Vessel review queue:

Review priority is a heuristic score from this repo ordering which tracks a human should look at. It is not evidence, and it implies nothing about any vessel.

Collection: 452 successful fetches in 24h, 47 errors across 13 source(s). Generated 2026-09-03 18:54 UTC.